My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time or any proper extension thereof <br />and No/100 dollazs 5( <br />pazagraph 3.1 for completion and ret <br />Article 5. PAYMENT <br />CONTRACTOR sha11 submit <br />Conditions. Applications for <br />Conditions. <br />5.1 Progress Payments, OWNER sh <br />on the basis of CONTRACTOR's Al <br />or about the last day of each month d <br />will be on the basis of the progress o: <br />pazagraph 2.9 of the General Conditi <br />of units completed) or, in the event <br />Requirements. <br />by OWNER, CONTRACTOR shall pay OWNERfiftv <br />for each day that expires after the time specified in <br />for final payment. <br />ions for Payment in accordance with Article 14 ofthe General <br />will be processed by ENGINEER as provided in the General <br />ll make progress payments on account of the Contract Price <br />)lications for Payment as recommended by ENGINEER, on <br />iring construction as provided below. All Progress payments <br />the Work measured by the schedule of values established in <br />ns (and in the case of Unit Price Work based on the number <br />there is no schedule of values, as provided in the General <br />5.1.1 Prior to Substantial Completio , progress payments will be made in an amount equal to the <br />percentage indicated below, but, in e ch case, less the aggregate of payments previously made and <br />less such amounts as ENGINEER sh 1 determine, or OWNER may withhold, in accordance with <br />pazagraph 14.7 of the General Condi 'ons. Ten Percent (10%) of Work Completed. <br />5.1.2 Upon Substantial Comi <br />CONTRACTOR to ninety-five <br />ENGINEER shall determine, or <br />General Conditions. <br />5.2 Final Payment. Upon final <br />pazagraph 14.13 of General Condi <br />recommended by ENGINEER as : <br />Article 6. INTEREST <br />No interest will be paid to the <br />Article 7. CONTRACTOR'S <br />In order to induce OWNER to enter <br />representations: <br />in an amount sufficient to increase total payments to <br />t(95%) of the Contract Price, less such amounts as <br />Z may withhold, in accordance with pazagraph 14.7 of the <br />iletion and acceptance of the Work in accordance with <br />OWNER shall pay the remainder of the Contract Price as <br />ed in said pazagraph 14.13. <br />on retained money unless required by law. <br />TIONS. <br />this Agreement, CONTRACTOR makes the following <br />71 CONTRACTOR has fami4rized itself with the nature and extent of the Contract <br />Documents, Work, site locality, andi a11 local conditions and Laws and Regulations that in any <br />manner may affect cost, progress, pefiormance or furnishing of the Work. <br />7.2 CONTRACTOR has studiedl cazefully all reports of explorations and tests of subsurface <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.