Laserfiche WebLink
conditions and drawings ofphysical co ditions which aze identified in the Supplementary Conditions <br />as provided in paragraph 4.2 of the G neral Conditions, and accepts the determination set forth in <br />pazagraph SC-4.2 of the Supplementary Conditions of the extent of the technical data contained in <br />such reports and drawings upon whic CONTRACTOR is entitled to reply. <br />73 CONTRACTOR has obtained and cazefully studied (or assumes responsibility for obtaining <br />and cazefully studying) all such exami ations, investigations, explorations, tests, reports and studies <br />(in additions to or to supplement th se referred to in pazagraph 7.2 above) which pertain to the <br />subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, <br />progress, performance or furnishing o the Work at the Contract Price, within the Contract Time and <br />in accordance with the other terms anconditions of the Contract Documents, including specifically <br />the provisions of pazagraph 4.2 of the General Conditions; and no additional examinations, <br />investigations, explorations, tests, re orts, studies or similar information or data are or will be <br />required by CONTRACTOR for suc purposes. <br />7.4 CONTRACTOR has reviewe, <br />the Contract Documents with respect <br />and assumes responsibility for the ac <br />examinations, investigations, explor <br />respect of said Underground Facilitie: <br />and fiunish the Work at the Contraa <br />other terms and conditions of Contrac <br />43 of the General Conditions. <br />7.5 CONTRACTOR has co <br />investigations, explorations, tests, <br />Documents. <br />7.6 CONTRACTOR has given ED <br />that he has discovered in the Contract <br />is acceptable to CONTRACTOR. <br />Article 8. CONTRACT <br />The Contract Documents which <br />CONTRACTOR concerning the W, <br />8.1 This Agreement (pages 1 to <br />8.2 Exhibits to this Agreement <br />83 Performance and other <br />pages. <br />8.4 Notice of Award. <br />8.5 General Conditions (pages <br />and checked all information and data shown or indicated on <br />o existing Underground Facilities at or contiguous to the site <br />urate location of said Underground Facilities. No additional <br />tions tests, reports, studies or similaz information or data in <br />are ar will be required by CONTRACTOR in order to perform <br />Price, within the Contract Time and in accordance with the <br />Documents, including specifically the provisions ofpazagraph <br />the results of all such observations, examinations, <br />and studies with the terms and conditions of the Contract <br />written notice ofall conflicts, errors or discrepancies <br />is and the written resolution thereof by ENGINEER <br />)mprise the entire agreement between OWNER and <br />consist of the following: <br />inclusive). <br />to , inclusive.) <br />identified as exhibits and consisting of <br />to 62 inclusive). <br />19 <br />