Shop Dratvings-All drawings, diagrams, lllu~
<br />schedulcs and other data which are specifically pr pared by
<br />or for CONTRACTOR to illustrace some ponion of the Work
<br />and all illuscations, brochures, standard schedul , perfor'
<br />mance charts, instructions, diagrams and other in ormation
<br />prepared by a Supplier and submitted by CONTR CTOR to
<br />illustrate material or equipment for some portion of hcWork.
<br />Specifrcarions-Those portions of the Contcact ocumemb
<br />consisting of written technical descriptions of ma[erials,
<br />equipment, construction systems, standards and workman-
<br />ship as applied to the \Vork and certain adminis[ra ive details
<br />appticable thereto.
<br />Subcantractor-An individual, firtn or cocporati n having a
<br />direct contrac~or for the performa ~nce of P rt f the ~ ~ ork ast e
<br />sita
<br />Su6srantial Completiars-The Work (or a specified
<br />has progressed to the point where, in the opinic
<br />NEER u evidenced by ENGINEER's definitiv
<br />of Substantial Completion, it is sufficientty c
<br />accordance with the Contract Documents, so th
<br />(or specified paR) can be utilized for the purpos
<br />it is intended; or if there be no such eertificate i
<br />final payment is due in accordance with paragaF
<br />terms "subst ~ac'~~ ai~~ Y ~y `Vork referto S bstac
<br />pleted" as app i
<br />tion thereof.
<br />Supplementary Conditions-The part of the
<br />ments which amcnds or supplements these
<br />tions.
<br />Supplier-A manufacmrer, fabricator,
<br />materialman or vendor.
<br />Undergrourtd Faciliries-A11 PiPelines, conawc
<br />wires, manholcs, vaults, tanks, tunnels or otho
<br />or attachmenu, and any encasements contai
<br />ities which have been installed underground t
<br />the foilowing services or materials: electricit
<br />►iquid petroleum products, telephone or ott
<br />tions, cable television, sewage and drainage
<br />or other control systems or water•
<br />Unit Price Work-Work ta be paid for an
<br />prices.
<br />Work-The entire completed construction o
<br />arately identifiabte parts thereof required
<br />under the Contract Documents. Work is t
<br />Corming secvices, furnishing labor and fum
<br />poraciag materia(s and equipment into the
<br />as 2quired by the Contract Documen[s.
<br />Work Directive Changt-Awritten d[rectrv
<br />TOR, issued an or aRer the E(Tective Date and signed by OWNfiR and recommended
<br />of ENGI-
<br />certificate
<br />nplete, in
<br />the Work
<br />for which
<br />ued, when
<br />14.13. The
<br />ially com-
<br />al Comple-
<br />orderinS an addition, deletion or rcvision in the Work, or
<br />responding [o dillering or unCoreseen physical conditions under
<br />which the 1Vork is to be performed as provided in earagraph
<br />4.2 or 43 or to emergencies under paragcaph 6.22. A Work
<br />Dircctive Change may not change the Contract Price or the
<br />Contrac['fime, but is evidence that the parties expect that
<br />the change directed or documented by a Work Directive
<br />Change will be incorporated in a subsequently issued Change
<br />Order following negotiations by the parties as to its ellect, if
<br />any, on the Contracc Price or Contracc Time as provided in
<br />pacagraph 10.2.
<br />Written Amendment-A writ[en amendment of the Contract
<br />Documents, signed by OWNER and CONTRACTOR on or
<br />afeer the Effective Date of the Agrcement and normally deal-
<br />ing with the nonengineering or nontechnical ra[her than svicUy
<br />Work-related aspects af the Contract Documents.
<br />ARTICLE 2-PRELIMINARY MATTERS
<br />Delivery of Bonds:
<br />2,1, Nhen CONTRACTOR delivers the executed Agree-
<br />ments to OWNER, CONTRAC'fOR shall aiso deliver to
<br />OWNER such Bonds as CONTRAC'COR may be required to
<br />fumish in accordance with para8 P
<br />Copies ojDocuments:
<br />2.2. OWNER shall fumish to CONTRACTOR up to ten
<br />;ract Docu- coPies (unless othenvise specified in the Supplementary Con-
<br />:ral Condi- ditions) of the Contract Documents as are reasonably nec-
<br />essary for the execution of the Work. Additional copies will
<br />be furnished, upon requesc, at the cost of reproduction.
<br />distributor,
<br />* Cantmerscemeat ojCorstract Time; Nolice to Proceed:
<br />ducts:cab(ee,
<br />23. The Contract Time will commence to run on the
<br />te of the Agreement, or, if
<br />D
<br />;uchfacilities
<br />a
<br />thiRieth day after the Effective
<br />on the day indicaced in the
<br />i
<br />ng such facil-
<br />f
<br />ven,
<br />a Notice to Proceed is g
<br />e to Proceed. A Notice to Proceed may be given at any
<br />ll
<br />ti
<br />'umish any o
<br />c
<br />o
<br />within thiRy days after the Etfective Date of the ASree-
<br />i
<br />gases, steam,
<br />me
<br />t
<br />In no event will the Contract Time commence to cun
<br />t
<br />, communica-
<br />moyal, traffic
<br />men
<br />.
<br />later than the sevenry-fifth day after the day of Bid opening
<br />ive Date ofthe AgreemenL
<br />orthe thiKieth day after the Effect
<br />whichcver date is earlier.
<br />: basis of unit
<br />Starting the Projeel: . "
<br />CONTRAC'I'OR shall start to perform the Work on
<br />x various sep-
<br />2.4.
<br />when the Contcacc Time commences eo run, but no
<br />t
<br />d
<br />i be tumished
<br />result of per-
<br />e
<br />a
<br />the
<br />Work shall be done a[ the site prior [o the date on which the
<br />ling and incorv
<br />Contract Time commences to run•
<br />mstcuc[ion, all
<br />Bejore Starting Cattstruttiatt:
<br />ach part of the Wark. CON-
<br />i
<br />to CONTRAC-
<br />ng e
<br />2.5. Before undertak
<br />the
<br />ll earefuily study an
<br />h
<br />c
<br />r
<br />the A6reGment
<br />a
<br />TRACTOR s
<br />n
<br />fis res sho
<br />ertinent
<br />nd chcck and veriCY P
<br />v ENGINEER,
<br />Documents a
<br />*See Supplementary Conditionsl 39
<br />
|