My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereon and all applicable field measurements. <br />will acceptable <br />ONTRAC- soaENGINEER finatized vd ngean o derlyeprog ession oE he <br />i~ TOR shall promptlY report irt writing to ENGI <br />ancy which CON7'RA <br />i <br />EER any <br />OR may Work to completion within the Contract Time;-but such <br />ENG[NEERres <br />on <br />ibili <br />screp <br />conflict, error or d <br />discover and shall obtain a written interpretatio <br />p <br />s <br />ty <br />or ctarifi- acceptancewillneitherimposeon <br />k for the pro6ress or scheduling of the Work nor relieve CON- <br />eation f[om ENGINE6R before proceeding wit <br />CONTRAC'I'OR sha <br />any \Vor <br />l not be lia- TRACTOR from Cult responsibility thercCor. The finalized <br />ill b <br />bl <br />afEected thereby; however, <br />ble to OWNER or ENGINEER for fai(ure to <br />e accepta <br />e to <br />report any schedule of Shop Drawing submissions w <br />ENGINEER as providing a workable arrangement for pro- <br />canflict, error or discrepancy in the Contract <br />unleSSCONTRACTORhadactualknowledgethe <br />ocuments, <br />oforshould <br />bletoENGiNEERas'toCormandlsubstance.W''t <br />t <br />5 <br />reasonably have known thereof. <br />a <br />accep <br />be <br />~ <br />2.6. Wiehin ten days afrer the Effective Datc <br />men[ (unless olhenvise specified in the Gene <br />fthe Agree- <br />al Require- pRTICLE 3-CONTRACT DOCUMENTS: INTENT, <br />ments), CONTRAC'f0R shall submit to EN <br />INEER for pMENDING, REUSE <br />review: <br />2.6.1. an estimated progress schedule i <br />and completion dates of the various <br />tin <br />dicating the Intent: <br />stagu of the 3.1. The Contract Documents comprise the entire agree- <br />the <br />i <br />' <br />g <br />star <br />ng <br />OR concern <br />ment between OWNER and CONTRACf <br />Work: <br />Work. The Contract Documents are complementary; what is <br />2,6,2, a preliminary schedule of Shop <br />rawing sub- called for by one is as binding as if called for by all. The <br />will be construed in accordance with <br />missions; and <br />! <br />Contract Documencs <br />the law of the place of the Project. <br />2.63. a preliminary schedule of valucs <br />hich will include quantities and p <br />k <br />for all of the <br />'ces of items * 3,2, It is the intent of the Contract Documents [o describe <br />on- <br />b <br />w <br />Wor <br />aggregatingtheContcactPriceandwillsubdi <br />e c <br />idetheWork a funetionally complete Project (or part thereofl to <br />h the Contract Documents. Any <br />i <br />h <br />into component parts in sufficient detail t <br />aymen[s during const <br />s <br />t <br />serve as t <br />e Stfucted in accordance w <br />ction. Such Work, ma[erials or equipment that may reasonably be inferred <br />p <br />basis fot progres <br />prices wilt include an appropriate amoun[ o <br />overhead and from the Contract Documents as being requiced to produce <br />d whetheror not specifically <br />li <br />( profit applicable to each item of Work whi <br />by CONTRACTOR at [h <br />ifin <br />e <br />h will be con- the intended result will be supp <br />time of sub- called for. When words which have a well-known technical <br />l <br />i <br />g <br />firmed in wr <br />s or <br />a <br />or trade meaning are used to describe Work, mater <br />mission. <br />equipment such words shall be interpreted in accordance with <br />i <br />2.7. Before any Work at the site is starte <br />CONTRAC- that meaning. Reference to standard specificatiocis, manuals <br />organiza[ion or association, <br />iet <br />ER <br />l <br />i TOR shall deliver to OWNfiR, with a copY ca <br />ther evidence of insuranc <br />d <br />y, <br />soc <br />ENGINE <br />, orcodes ofany technica <br />requested by or to the Laws or Regulations of any governmental authority, <br />li <br />h <br />o <br />eer[ificates (an <br />OWNER)whichCONTRACTORisrequired[ <br />a <br />purchaseand whether such reference be specific or by implication, s <br />code or Laws <br />manual <br />acion <br />ifi <br />~ maintain in accordance with pareSraPhs 5. <br />CONTRACTOR c <br />, <br />, <br />c <br />and 5.4, and mean the latest standard spec <br />ttifica«5 (and er Regulations in effect at the time of opening of Bids (or, on <br />( OWNER shall delivec to <br />e of insurance requested by C <br />id <br />NTRACTOR) the Effective Date of the Agreement if there were no Bids), <br />no <br />r <br />H <br />enc <br />` other ev <br />which OWNER is required Co purchase a <br />, <br />oweve <br />d maintain in except as may be otherwise specifically stated. <br />d standard speci6cation, manual <br />; accordance with paragraPhs 5.6 and 5.7. <br />pravi:ion of any reference <br />or code (whether or not specifically incorporated by reference <br />I <br />in the Contrac[ Documents) shall be eftective to change the <br />' <br />~ Pretorsrtructiart Conjerertce: <br />Effect <br />h <br />fOR oc <br />du[ies and responsibilieies of OWNER, CONTRAC <br />ve Da[e of the ENGINEER, or any of [heir consuitants, agents or employ- <br />e <br />~ 2.8. Within twcnty days aRer t <br />pgceement, bu[ before CONTRACTOR sta <br />s the Wark at ees from those sef forch in the Contract Dowments, nor shall <br />n to ENGINEER, or any of ENGI- <br />assi <br />ENGI <br />t <br />i <br />~ the site, a conference attended by CONT <br />~ <br />d others as appropriate will be hcl <br />EER <br />g <br />o <br />vc <br />- it ye c([ect <br />CTOR, <br />to discuss the NEER's wnsultants, agents or emploYees, any duty or <br />or perFormance <br />ishin <br />t <br />h <br />an <br />, N <br />schedules referred to in paragraph 2.6, to dis <br />ther su <br />d <br />g <br />um <br />e <br />authority to supervise ordirect t <br />uss procedures <br />mit[als and for of the Work or any duty or authority to undertake responsi- <br />16 <br />o <br />for handling Shap Drawings an <br />rocessingApplicaaonsforPayment,andtoes <br />. <br />blishaworiting bilicy contrary to the provisions of paragraph 9.15 or 9. <br />etations of the Contract Documents <br />p <br />' understanding among the parties as to the <br />ork. Clarifications and interpr <br />ENGINEER as provided in paragraph 9.4. <br />d b <br />i <br />. <br />y <br />ssue <br />xhall ba <br />Fixalirirtg Schedales: <br />33. If, during the perfortnance of the Work, CONTRAC- <br />or discrepancy in the Contract <br />1 <br />9. At leut ten days beCore submission <br />2 <br />f the first Appli- TOR finds a conftict, ecror <br />d <br />R <br />P <br />R <br />. <br />eation for Payment a eonterence atte en <br />as a <br />p <br />h <br />d <br />he Worka[Cecu <br />h <br />b for proceed ngw <br />I b~ hRd fa D W~ ngatonxand <br />retation or clarificadon <br />r <br />t <br />i <br />pp <br />ers <br />ot <br />TOR, ENG[NEER an <br />, finalize the sehedules submitted ia accor <br />p <br />e <br />n <br />ance with para- thereby shall obtain a written <br />' *See Supplementary Conditions <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.