My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requiras rceonstruction and CON"iRACTOR is placed <br />~ in chargt thcreof..CONTRACfOR xhall c paid for <br />services a fec proportionate to that stxted i paragraph <br />II.G.?. <br />11.4.5.7. The cost of utilities, fuel a d sanitary <br />facilities at the site. <br />11.4.5.8. Minor expenses such as tele rams, long <br />dist:+nce telephone calls, telephone servic at the site, <br />expressage and similar petty cash items in cortnection <br />with the Work. <br />11.4.5.9. Cost of premiums for additi nal Bonds <br />and insurance required because ofchanges n the Work <br />and premiums Cor property insurance cov rage within <br />the limits of the deductible amounts est blished by <br />OWNER in accordance with paragraph 5.5. <br />11.5. The term Cost of the Work shall not in luda any of <br />the following: <br />1I <br />4 <br />1I.5.1. Payroilcostsandothercompensat <br />TRACTOR's officers, executives, principals <br />ship and sole proprietorships), generai man <br />neers, archicects, estimators, attorneys, audit <br />tants, purchasing and con[racting agents, <br />timekeepers, clerks and other personnel e <br />CONTRACTOR whe[her at the site or in ~ <br />TOR's principal or a branch office for genera <br />tion of the Work and not specifically included <br />upon schedule of job classifications referre< <br />graph 11.4.I or specifically covered by paragr <br />all of which are [o be considered adminisi <br />covered by the CON'fRACTOR's Fee. <br />11.5.2. Expenses of CONTRACCOR's F <br />branch offices other than CON'I'RAC'fOR's <br />site. <br />m of CON= <br />of panneo- <br />tgers, engi- <br />rs.accoun- <br />expeditors, <br />iployed by <br />administra- <br />i the agreed <br />to in para- <br />ph It.4.4- <br />ative costs <br />al and <br />at the <br />CONTIUCTOR's Fee: <br />11.6. Thc CON"CRACTOR's Fte allowed to E' ONTRAG <br />TOR (or overhead and profit shall be determined as follows: <br />11.6.1. a mutuatly acceptable fixed Cee: or iC nane can <br />bc agreed upan. <br />11.6.2. a Cee based on the Collowing pcrcentages of the <br />various portions of the Cost of the Work: <br />11.6.2. L. for wsts inwrted under paragraphs 11.4.1 <br />and 11.4.2, the CONTRACTOR's Fee shall be fifteen <br />percent; <br />11.6.2.2. forcostsincurredunderparagraph11.43, <br />the CONTRAC'f0R's Fee shall be fve percent: and if <br />a subcontrac[ is on the basis of Cost of the Work Plus <br />a Fee, Ihe maximum allowable to CON'fRACTOR on <br />account of overhead and profit of all Subcontreccors <br />shall be fifteen percen[; <br />1I.6.23. no fee shall be payable on the basis of <br />costs itemized under paragraphs 11.4.4, t 1.4.5 and 11.5; <br />11.6.2.4. [he amount of credit to be atlowed by <br />CONTRACfOR to OWNER for any such change which <br />results in a net decrease in tast will be the amount of <br />[he actual net decrease plus a deduction in CONTRAC- <br />TOR's Fee by aa amount equal to ten percent of the <br />netdecrease;and <br />11.6.2.5. when both additions and credits are <br />involved in any one change, the adjustm'ent idCON- <br />TRACTOR's Fee shall be computed on [he basis of the <br />net change in accordance with paragraphsl1.6.2.i <br />throagh I1.6.2.4.inclusive. <br />11.7. Whenever the cost of any Work is to be determined <br />expenses, Pursuant to paragraph 11.4 or ILS, CONTRACTOR will <br />employed submit in form accepeable to ENGINEER an itemized cost <br />'COR for breakdown together with supporting data. <br />11.5.4. Cast of premiums for all Bond and far all <br />insurance whether or not CONTRACCOR i required by <br />the Contract Documents to purchase and aintain Ihe <br />same (except for the cos[ of premiums cov red by sub- <br />paragraph 11.4.5.9 above). <br />11.53. Anypart ofCONTRACI'OR': <br />including interest on CONTRACTOR'S <br />for the Work and charges against CO <br />delinquent paymcnts. <br />11.5.5. Costs due to the negligence of <br />TOR, any Subcontractor, or anyone directl} <br />employed by any oC them or for whose act: <br />may be liable, including but not limited to, 1 <br />of dcjective Work, disposal of materials ~ <br />wrongly supplied and making good any dar <br />Crty. <br />11.5.6. Olher overhead or general exp <br />any kind and the eosts oC any item not sp <br />expressly inc(uded in paragraph 11.4. <br />Cath Allowaeces: <br />11.8. It is understood ttiat CONTRACTOR has included <br />in the Cantract Price all allowances so named in the ContracC <br />Documents and shatl causo the Work so covered to be done <br />by such Subcontractors or Suppliers and for such sums within <br />the limit of [he allowances as may be acceptabk [o ENGI- <br />NEER. CONTRACCOR agrees that: <br />or indirmtly <br />anyofthem 11•$•1• The allowances include the cost to CON- <br />e correction TRACTOR (less any applicable trade discounts) of mate- <br />~ equipment rialsandequipmentrequiredbytheallowancestobedeliv- <br />ase ta PraP. ered at the site, and ail applicable taxes; and <br />11.81. CONTRAC'COR's costs Cor unlaading and <br />nse costs of handling on the sile, labor, installation eosts, overhead, <br />cifiwllyand profitandolhcrexpensescontemplatedCortheallowances <br />have been included in the Contract Prica and not in the <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.