Laserfiche WebLink
Trench Safety <br />The CONTRACTOR shall <br />trenches more than fi <br />tional Safety and Hei <br />Part 1926, Subpart P• <br />duced herein for com <br />the Texas Legislaturi <br />construction are inu <br />install a Trench Safety System for all <br />re (5) feet deep in accordance with Occupa- <br />Ith Administration (OSHA) Standards, 29CFR, <br />-xcavations Trenching and Shoring, repro- <br />anience. Furthermore, legislation passed by <br />, H.B. 662 and H. B. 665 regarding trench <br />roorated herein by reference. <br />The CONTRACTOR's att ntion is directed to the Bid form which <br />includes a bid item or furnishing, installing and removal of <br />Trench Safety System , under which full compensation will be made <br />for all design, mate ials equipment and labor required to provide <br />the Trench Safety Sy tem. <br />After award of the C ntract, but before execution of the AGREE- <br />MENT, the CONTRACTOR shall submit a trench excavation plan (4 <br />sets) to the CITY EN INEER. 7his trench excavation plan must be <br />designed and sealed by a registered professional engineer, <br />registered in the S ate of Texas, with experience in soil mechan- <br />ics. The CONTRACTO is responsible for retaining this engineer <br />and obtaining soil orings, soil analysis and any other testing <br />or consultants requ~red to provide the trench excavation plan. <br />Any changes in the rench excavation plan after initiation of <br />construction will n t be cause for extension of time or change <br />order and will requ re the CONTRACTOR to resubmit a revised <br />trench excavation p an for review by CITY ENGINEER. <br />The CONTRACTOR <br />all applicable <br />The review by CITY <br />OSHA safety standa, <br />does not relieve tl <br />methods, technique <br />bodily injury (inc <br />trench or from Cit <br />tion plan shall re <br />the CONTRACTOR. C <br />dards for trench e <br />its sole responsibility for compliance with <br />;y requirements. <br />:NGINEER is only for general conformance with <br />is and review of the trench excavation plan <br />a CONTRACTOR of any or a~o eo~ytdamagenoreans, <br />, and procedures. Any p p <br />ading death) that arises from use of the <br />'s failure to note exceptions to the excava- <br />N'rRACTORS haveth~ee ~ways t to a meet ~05HA ~Stanf <br />e <br />ion: <br />1. Minimum angle of Repose for sloping of the sides of excava- <br />tions. <br />p. Utilization o Trench Box. <br />3, Shoring, Shee ing, and Bracing Methods. <br />CONTRACTORS electi g to utilize the Minimum Angle of Repose must <br />submit: <br />1. Soil classification according to the Unified Soil Classifi- <br />cation Syste including water content and plasticity index, <br />and a minimuM angle of the slope of excavation for the <br />trench. <br />(09 <br />