My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required o be assembled and furnished by CONTRACTOR <br />are appli able to the items actually installed and in <br />accordanc with the Contract Documents, and have this <br />material elivered to ENGINEER for review and forward- <br />ing to OW ER prior to final payment for the Work. <br />12. Completio <br />a. Befo e tNGINEER issues a Certificate of Substan- <br />tial Completion, submit to CONTRACTOR a list of <br />obse ved items requiring completion or correction. <br />b. Cond ct final inspection in the company of ENGI- <br />NEER OWNER and CONTRACTOR and prepare a final <br />list af items to be completed or corrected. <br />c. Obse ve that all items on final list have been <br />comp eted or corrected and make recommendatians to <br />ENGI EER concerning acceptance. <br />C. <br />Limitations of Authority <br />Resident Proje t Representative: <br />1. Shall not authorize any deviation from the Contract <br />Documents or substitution of materials or equipment, <br />unless au horized by ENGINEER. <br />2. Shall not exceed limitations of ENGINEER's authority as <br />set forth in the Contract Documents. <br />3. Shall not undertake any oT the responsibilities of <br />CONTRACTO , subcontractors or CONTRACTOR's superinten- <br />dent. <br />4. Shall not advise on, issue directions relative to or <br />assume co trol over any aspect of the means, methods, <br />technique , sequences or procedures of construction <br />unless su h advice or directions are specifically <br />required y the Contract Documents. <br />5. Shall not advise on, issue directions regarding or <br />assume co trol over safety precautions and programs in <br />connectia with the Work. . <br />6. Shall not accept Shop Drawing or sample submittals from <br />anyone ot er than Contractor. <br />7. Shall not authorize OWNER to occupy the Project in <br />whole or 'n part. <br />8. Shall not participate in specialized field or laborato- <br />ry tests r inspections conducted by others except as <br />specifica ly authorized by ENGINEER. <br />-73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.