My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-CHANGE ORDER #1 AND AUTHORIZE FINAL PAYMENT AND CLOSE CONTRACT WITH BRAY CONSTRUCTION
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
11 November
>
11.12.12
>
09-CHANGE ORDER #1 AND AUTHORIZE FINAL PAYMENT AND CLOSE CONTRACT WITH BRAY CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2012 3:01:36 PM
Creation date
11/9/2012 3:01:36 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � i <br />Texas Department of Agriculture <br />Construction Contract Change Order <br />Owner �comraaor �o�aucy): Contract For tPro�ecc descr�at�or,�: � Region 5 <br />City of Paris Manhole Rehabilitation TxCDBG Contract <br />P.O. Box 9037 I No.729599 <br />Paris, TX 754fi1 � Project Location: Paris, TX Firnal ge Order No. 1 and <br />C011t�8Ct0�: (Name S Address) i E(1g1�@eC: (Name & Address) <br />B. Bray Construction Co., Inc. � Hayter Engineering, Inc. <br />P.O. Box 6365 i 4445 SE Loop 286 <br />Pa�is, TX 75461 Paris, TX 75460 <br />Owner is requesting TDA review to determine eligibility of change order expenses. <br />Changes to Existins� Line Items {Items from original bid or added in previous change <br />order on <br />Item Item Description Current Unit <br />No. Quant+ <br />9 Customer service cleanout 4 EA <br />10 Eccentric reducer � � <br />13 4" Fernco SS connector 4 EA <br />item Item Description <br />No. <br />Unit <br />• � f� <br />.r �+ <br />.� �� <br />1 <br />1 <br />1 <br />(Items without a unit price in the original bid) <br />sch separate documentation if necessary): <br />Chan e in Contract Price <br />Original Contract Price: <br />Previous Change Order(s} <br />No. to No. <br />!'`nntrar.t PriCe PTIO� t0 <br />this Chan e Order <br />Net Increase of <br />this Change Orde� <br />$115,269.00 <br />$0.00 <br />$115,269.00 <br />$57�.00 <br />in I Change in <br />(+/-1 Contract Price <br />Unit Unit Price I Change in <br />Ouantitv (+!- <br />Chanae in Contract Time <br />Original Contract Time; <br />Net Change From Previous <br />Chan e Orders <br />Contract Time Prior to <br />this Change Order <br />Net Increase/Decrease of <br />this Change Order <br />so.00 <br />Change in <br />mtract Price <br />90 days <br />m <br />Contract Price With all `'v""°`'` ""'° .."'. "" <br />A roved Chan e Orders $1.15,839.00 A roved Chan e 90 <br />Cumulative % Chan e in Contract Price: 0.5% <br />Notice: * Generally, a cumulative change in the contrad price in excess of 25% cannot be approved. <br />* Reimbursement of costs submitted in this change order are subject to approval by the Department. <br />See 7xCDBG Project Implementation Manual Section 5.2.5. <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.