Laserfiche WebLink
CITY OF PARIS ENGINEERING DEPARTMENT <br />DEVELOPMENT PLAN REVIEW <br />Address: <br />O1. Submit a complete Grading and Drainage Plan sealed by a Texas Registered Professional Engineer. This plan <br />will show existing and proposed contours, including those on adjacent properties, and finished floor with pad <br />elevations (Elevations tied to City of Paris / FEMA benchmark). Show a drainage area map and drainage <br />calculations (pre and post development). Show all existing and proposed drainage structures and contours. <br />Show individual lot grading plans for all developments. <br />� 2. Submit a utility layout plan, sealed by a Texas Registered Professional Engineer, indicating existing and <br />proposed water and sanitary sewer facilities and services, including water meter size with backflow <br />prevention device (indicate usage if domestic, irrigation, etc.) and locations. Water meters shall be in the <br />City's R.O.W. or easement and backflow device on private property adjacent to the meter. <br />� 3. City of Paris Fire Department requirements, (Call Dale Maberry, 903-784-9226) fire hydrant must be located <br />within 400 feet of all exterior portions of non-sprinkled buildings and 600 feet of sprinkled buildings. The <br />installation and location of all fire hydrants shall be included on the utility layout plan. Show all yard water <br />piping and FDC yard pipe if building is sprinkled. <br />O4. Include a dimensional control plan that shows all the existing and proposed fire hydrants, FDC yard pipes, <br />Fire lanes and all layout dimensions. Show all existing and proposed easements on the plan. <br />O5. All plans shall be signed and sealed by a Texas registered professional Engineer. The Developer and <br />Engineer are responsible for providing as-built plans priar to final acceptance of the project. <br />O6. Include a copy of the plat or deed and show all the easements on the property and adjacent to the property. <br />Provide a cover page; include the address, name of subdivision, lot number, block number of the property, <br />vicinity map and the required text. Also, include Developer(s) and Engineer's name, address, and phone <br />number. All property shall be platted prior to development (See City of Paris Building and Platting Process). <br />O7. Driveway & Utility permits are required for work performed in Texas Department of Transportation Right- <br />of-Ways. For driveway permits inside the City limits the permit shall be completed by a bonded concrete <br />contractor and submitted to the City of Paris for permitting. All driveways shall be permitted by the City of <br />Paris. <br />O 8. If the property is in a FEMA floodplain. A flood study may be required. Show floodplain on the grading <br />and/or drainage plan. Check the Master Drainage Plan (all channels shall be concrete lined at a minimum). <br />O9. Submit 3-sets of civil plans to the Engineering, Planning & Development Department for review. Please <br />allow 2-3 weeks for Review. <br />Reviewed By: Shawn Napier, P.E. (903) 784-9292 Date: <br />DPLANREV(09-02-10) � � <br />