My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17-STRATEGIC PLAN
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2013
>
01 January
>
01.14.13
>
17-STRATEGIC PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2013 2:29:15 PM
Creation date
1/10/2013 2:29:14 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iz/i3/iz <br />4.0 Utilities: Create a highly reliable and flexible department that ensures the safe and reliable <br />supply of potable and raw water, and the proper treatment and disposal of wastewater. <br />4.1 Develop a schedule and budget for recommended Pat Mayse Lake and other water <br />production facilities improvements. <br />4.1.1 Inspect air pressure and surge valves on the 30" and 36" transmission lines from <br />the intake to the water treatment plant, refurbish or replace as necessary, <br />beginning in 2012-13. <br />4.1.2 Increase electrical system capacity to obtain the ability to run all four pumps <br />simultaneously, beginning in 2013-14. <br />4.1.3 Install new pumps or refurbish existing pumps (total of four), beginning in 2014- <br />15. <br />4.1.4 Install new check and gate valves, beginning in 2014-15. <br />4.1.5 Dredge around intake structure and replace intake wet well gates, beginning in <br />2015-16. <br />4.2 Develop a schedule and budget for wastewater plant planning, design, and construction. <br />4.2.1 Explore funding options for design/construction of a wastewater treatment <br />plant, beginning in 2012-13. <br />4.2.2 Solicit proposals from engineering firms for wastewater treatment plant <br />design/construction in 2013-14. <br />4.2.3 Select an engineering firm and fund the design phase in 2014-15. <br />4.2.4 Evaluate alternatives to a single large new wastewater plant. <br />4.2.5 Construct new facility in 2015-18. <br />4.3 Evaluate opportunities to improve, and/or eliminate the number of, lift stations. <br />4.4 Improve SCADA system in 2012-13, including installation of new communications tower. <br />4.5 Improve mixed media filters. <br />4.5.1 Complete a study and develop a schedule and budget in 2012-13. <br />4.5.2 Complete replacement of filters in 2013-18. <br />4.6 Develop and adhere to a comprehensive program and specific schedule to perform both <br />routine and major infrastructure maintenance and upgrading. <br />4.7 Consider possible reorganization of utility and utility-related functions. <br />4.7.1 Evaluate transferring responsibility for certain utilities infrastructure, such as <br />water towers, from public works to utilities, by 07/13. <br />4.7.2 Evaluate transferring administrative responsibility of water and sewer line <br />maintenance from public works to utilities, by 07/13. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.