Laserfiche WebLink
~ <br />4 <br />■ <br />~ RON HAYES, PE <br />Civil Engineer ~ <br />' Carter Ft Burgess, Inc. <br />~ <br />Education <br />~ B.S., fivil Engineering, 1980 <br />~ Old Dominion University <br />f~ Professional Registration <br />Registered Professional Engineer <br />~ 1985, TX, 58807 <br />~ Organizations <br />3 Ameriron Sociery of Civil Engineers <br />Texas Natural Resource Conservotion Commission <br />~ <br />~ Professional Experience <br />Mr. Hayes hos aver 20 years of experience in civil engineering consulting with responsibiliry for planning and management of civil <br />' and environmental engineering projeds. Mr. Hayes has eztensive experience in the preparation of plans, specifications and <br />estimotes for water, wastewater, drainage ond paving projeds. <br />! <br />~ Relevant Project Experience <br />~ . Iron Bridge Pump Station Preliminary Design, TX; Projed Engineer. Design of 22-mile, 108-inch diameter raw wnter <br />' transmission pipeline from Lake Fork to Lake Tawakoni. <br />_ • lake Fark Pipeline, Dallas, TX; Project Engineer. Project consisted of designing 26-miles of 108-inch diometer raw water <br />transmission pipeline from Lake Fork to Lake Tawakoni in east Texas. The design included pfeliminary hydroulic design of a <br />a <br />future Lake Fork Pump Station, surge anolysis for the transmission system, final plans and specifications for the pipeline, <br />2 permitting by the Corps of Engineers and TXDOT, conducting environmental and archeological surveys. Estimated construdion <br />! cost of 590,000,000. <br />3 • North Park Public Utility District, Horris [ounry, TX; Projed Engineec Provided services to distrid induding design and <br />i preporation of technical specifications ond contrad documents for water, wastewoter, paving and drainage improvements. <br />Services included construdion oversight, progress payment review, state agenry submittals and fund applications. <br />i <br />• Water and Wastewater Design for Unserved Areas, Dallas, TX; Projed Engineer. Preliminary design and evaluation for 710 <br />~ unserved areas in Dallas. Design oversight for 19,200 linear feet of B-inch wastewater main and 8,400 linear feet of 16-inch <br />, woter main under first unserved area ronstrodiom mntmct. <br />a <br />s <br />s <br />a <br />