Laserfiche WebLink
0 <br />~ ALBERT PETRASEK, Jr, PhD, PE <br />Page 5 <br />a <br />2 • Comprehensive Developmentol Moster Plan for the [iry af Orange, Tezas; Projed ManagedEngineer. Projed included the <br />3 development of a Comprehensive Developmental Plan for this city of 23,000 in southeast Tezas. Work performed included the <br />~ preparation of land use plans master plans for water, wastewater, and municipal solid wastes; mapping of the city; and <br />development of the ciry GIS. <br />~ <br />~ • Water and Wastewoter Master Plans for the Liry of Wilmer, Texas; Projed Manoger/Engineer. Project included the preparation <br />of both woter and wastewater master plans for this ciry of 5,000. Planning period was through the year 2020. <br />~ <br />• Utility Master Planning, Lone Star Army Ammunition Plant, Texarkana, Texas; Principal-in-Chorge; preparation of Facility Plan <br />~ for this industrial complex of over 40 square miles in north eost Tezas. Work included water distribution system, wastewater <br />collectian system, the water treatment plant, the wastewater treatment plant, and performing a leak detection study on the <br />distribution system.. <br />3 <br />~ • Bexar Lounry Water System Planning, San Antonio, Tezas; Projed Monager; development of Emergency Water Plan. Projed <br />included developing the prototype emergenry water plan for the forps of Engineers for San Antonio, Texas, which has 101 <br />~ water puNeyors, all using the Edwards Aquifer as the source of supply. <br />9 <br />] <br />~ <br />~ <br />3 <br />~ <br />~ <br />3 <br />~ <br />~ <br />i <br />31 <br />7 <br />31 <br />~ <br />~ <br />i <br />a <br />