Laserfiche WebLink
a <br />~ ALBERT PETRASEK, Jr, PhD, PE <br />Page 4 <br />■ <br />~ • Water Transmission line, Dollas, Texas; Projed Engineer, Projed included the design of 11 miles of 96-inch RCCP water <br />~ tronsmission line from the East Side Water Treatment Plant to Jim Miller Reservoir. fonstrudion cost of 524,000,000. <br />~ • Woter Transmissian Line, Dallas, Texas; Project Engineer; Projed for Dallas Water Utilities included the design and construdion <br />■ management af 17 miles of 84-inch transmission line from Jim Miller Pump Stotion to the Beltwood Reservoir. Construdion <br />~ cost was 527,000,000. <br />~ • CISCO - Woter Plant, (onfidential Clieni, Australia, Projed Manager; preparation of cost estimates and preliminary design of <br />' o reverse osmosis woter treatment faciliry for a DOD contrador. Project included the evaluation of existing weil field as a <br />source of supply, and design of modifications to existing facilities to accommodate the new treatment processes. <br />~ <br />• Design of Woter Meter Stotions for Dallas Water Utilities. Projed includes the designs for three metering stations; Hackberry, <br />~ Elm Fork, and lameson; that provide water metering service for DWU customer cities. Estimated project cost 54,500,000. <br />~ <br />' • Water Supply for the City of Mansfield. Design of well, ground storage, and booster pumps for the city. <br />~ • Safe Drinking Water Ad Studies, lone Star Army Ammunition Plant and Red River Army Ammunition Depot Tezarkana, Tezas; <br />' Projed Monager; Safe Drinking Water Ad studies for the 3.0-MGD surface water treatment plant, including Q study and <br />complionce evaluation. <br />1 <br />• Water Storage and Pumping Facilities, Highland Park, Texas; Projed Manager; design of 1,500,000-gallon Gillon Avenue <br />~ ground storage reservoir and booster pump station, including chlorine storage, handling, feeding and leak detedion <br />~ equipment. ConsTruction cost $1,500,000. <br />• Red Oak Water Treatment Plant, Red Oak, Texas Projed Monager; sanitary survey and preliminary design for Red Oak <br />2 Reservoir and preliminary design of 30-MGD treatment plant. Estimated construdion costs of $45,000,000. <br />• Ozone/UV Disinfedion Studies; Projed Engineer; performed evaluation of combined azone/UV disinfedion as an alternative to <br />~ chlorination. The process was found to be significantly improved over the use of either process individually. <br />3 • Ozonation Studies; Projed Engineer; performed evaluation of ozone contactor design <br />~ <br />• Projed wos performed for the U. S. EPA and included counter-current bu6ble diffusers, packed columns, ond continuous-flow <br />a sti«ed tank readors. <br />~ • D/FW Airport Booster Pumps, D/FW Internationol Airport, Texas, Projed Manager; addition of 10-MGD booster pumps at <br />~ 0/FW's East ond West Pump Stations. <br />i <br />~ <br />~ <br />a <br />