~
<br />~ ALBERT PETRASEK, Jr, PhD, PE
<br />Page 3
<br />~
<br />~ . Iron Bridge Raw Water Pump Station Renovations, Dallas, Texas, Project Diredor for the renovation of the 240 MGD raw water
<br />S pump statian. Project included the mechanical, eledrical, instrumentation ond controls, and structural components. Estimated
<br />~ construction cost of $21 million.
<br />' • Lake Fork Raw Water Transmission Line, Dallas, Texos Project Diredor for the design and construction administration of 26
<br />~ miles of 108-inch raw woter transmission moin. Line will run from the Lake Fork Pump Station, on the western shore of Lake
<br />Fork, to the Iron Bridge Pump Station on the western shore of Lake Tawakoni. Estimoted construction cost is $111 million.
<br />~ The first sedion, which is 39,000 LF, is under construction for a contrad amount of $27 million.
<br />3 • lake Fork Pump Station, Dallas, Texas Prepared design and cost estimates for the 216 MGD pump station with a conneded
<br />3 load of 24,000 HP. Prepared computer simulations of 26 miles of 108-inch line,l5 miles of 72-inch line, and 15 miles of
<br />3 84-inch line with 14 pumping units in iwo different pump stutions. Estimated construdion cost of 527 million.
<br />11 • Shorecrest 48-Inch Water Main, Dallas Water Utilities Principal-In-charge for the design of 4,000 LF of 48-inch woter main
<br />~ located on the north end of Love field in Dallas, Tx. The main conneded into the yard piping at the Bachman Water Treatment
<br />Plant. The construdion cost was 5920,000.
<br />3
<br />~ • Lake Tawakoni Transmission lines; Dallas, Texas; Projetl Diredor for ihe condition assessment, surge analysis, and surge
<br />protedion upgrading to 15 miles of 72-inch and 15 miles of 84-inch raw water transmission main.
<br />1
<br />• Iron Bridge Raw Water Pump Station No. 2, Dallas, Texos; Project Diredor for the preliminary design of the 300 MGD raw
<br />~ water pump station. Services provided included surveying, preparation of preliminary plans, cost estimates, and computer
<br />~ simulation of system hydraulics. Estimated construction cost is S25 million.
<br />3 • Woter Treatment Plant, (iry of Donna, Texas; Principal-In-Charge for the design of a new 6 MGD surface water treatment plont.
<br />3 Faciliry included raw water intake strudures, reador-clarifiers, filters, clearwell storage, and high seruice pumping. Disinfection
<br />for (T is with chlorine diozide followed by chlorination. Estimated construction costs of 55,300,000.
<br />7
<br />31 • long Range Woter Supply Plan for Dallas Water Utilities; Principol-In-Lharge. This project developed an implementatian
<br />program for the eastern portion of the (iry of Dallas system under drought conditions. The project had total estimated capital
<br />3 cosis of $500,000,000 and included o new 100 MGD surface wnter treatment plant, improvements to an ezisting 176 MGD
<br />3 pump station, the construdion of a new 100 MGD pump station, and the construdion of over 100 miles of 72 ond 84-inch
<br />transmission lines. `
<br />~
<br />~ • Benbrook Water Treatment Plant Expansion, Texos, Project Manager, projed included the expansion from 5.0 MGD to 11.0
<br />MGD. The treatment facilities included new rapid mixing basins, flocculation basins, clarifiers, and filters; additionally,
<br />~ improvements were designed to the ironsfer pump stafion, high service pumps, ond insirumentation und control sysfem.
<br />3 (onstrudian cost af 52,500,000
<br />i
<br />if
<br />A
<br />
|