My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-H Lost Water Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
03 - March
>
2002-03-11
>
06-H Lost Water Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 10:32:25 AM
Creation date
3/5/2002 4:17:02 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-H
AGENDA - Type
RESOLUTION
Description
Award contract for Water Lost and Unaccounted For Study to Carter & Burgess
AGENDA - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br />. ALBERT PETRASEK, Jr, PhD, PE <br />Page 2 <br />~ <br />, • Development of National Standards for the Installation of Eledromagneti4 flow Meters, Projed manager, U. S. EPA, Cincinnati, <br />Ohio. The projed included the development of national standards for the instollotion of eledromagnetic rype flow meters or oll <br />~ sizes. The projed was conducted by the U. S. EPA and the National Institute af Standards and Technology (previously the <br />a Nss). <br />■ • Development of Notionol Standards for the Instollotion of Venturi Tubes ond Venturi Noales , Project monoger, U. S. EPA, <br />' fincinnati, Ohio. The projed included the develapment of national standards for the installotion of venturi tube and venturi <br />noale rype flow meters or oll sizes. The projed was conduded by the U. S. EPA und the Notional Institute of Stondords ond <br />■ Technology (previously the NBS). <br />' • Development of National Standards for the Installution af Parshall Flumes and Palmer-Bowlus Flumes, Project manager, U. S. <br />! EPA, fincinnati, Ohio. The projed included the development of nationol standords for the installation of Parshall Flumes and <br />3 palmer-Bowlus Flumes or all sizes. The projed was conducted by the U. S. EPA and the National Institute of Standards and <br />Technology (previously the NBS). <br />~ <br />~ • Water and Wastewater Master Plan, Edinburg, Texas, Principal-in-Charge far a Wostewater Moster Plan for the Ciry of Edinburg <br />and its eztraterritorial jurisdidion, including several colonias. This Master Plan will guide the City's development in water and <br />~ wastewater for the next twenry years. Total planning area cavered 136 square miles. The following areas of concern are being <br />' studied i„ order to evaluate and make recommendations for the Ciys infrastrudure: <br />- Analyze cu«ent waste water system and future demands <br />31 - Evaluate existing wastewater colledion facilities <br />- Evaluate existing wastewater treatment facilities <br />~ - Analyze current wostewater system and flow records <br />~ - Evaluate existing pumping and treatment facilities <br />- Development of water nnd wostewoter hydraulic models <br />~ <br />2 As a toal for evaluoting these concerns, o Geographic Information System (GIS) for the City wos developed concurrently with an <br />overall Capital Improvement Plan (CIP). financial requirements associated with the CIP were identified as well as potential <br />~ funding sources. In oddition, several lift stations were eliminated because of the analysis. <br />1 <br />3 <br />i <br />~ <br />~ <br />~ <br />i <br />Raw Water Pump Station and Transmission line, Ciry of Palestine, Texas, Principal-In-fharge for the design of a 15 MGD raw <br />water pump statian and 11 miles of 36-inch raw water transmission main. The projed includes improvements to an existing <br />intake strudure, a new eledrical and chlorine diozide building, stand-by generator sets, the pump station, and the <br />transmission main. Services being provided include right-of-way acquisition, surveying, preparation of a design report, design, <br />surge anolysis, construdion administratian, and construction inspection. Estimated construdion cam are S 8 million. <br />Raw Water Pump Station and Tronsmission Line, Kinder Morgan; Quality Control for this projed that includes 27-miles of <br />transmission moin, a baloncing reservoir, and o new raw water pump station. Design flow for the projed in southeast <br />Oklahoma is 5 MGD and the estimated projed costs are S10 million. <br />~ <br />a <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.