Laserfiche WebLink
City of Paris, Texas <br />Make an inspection ofthe Project prior to expiration ofthe guazantee period and <br />report observed discrepancies under guarantees provided by the construction <br />contract. <br />Furnish the Owner, a set of record prints of drawings and addendum drawings <br />showing those changes made during the construction period, based upon the <br />marked up prints, drawings, and other data furnished by the Contractor to the <br />Consultant and which Consukant considers to be the significant. <br />SECTION 3. ADDITIONAL SERVICES <br />A. GeneraC In addition to the basic services to be furnished by the Consultant under <br />this proposal for which the payment of the standard consulting fee shall be made, the <br />Consultant shall furnish additional services ofthe following types, if AIJTHORIZED BY <br />THE OWNER IN WRITING, to be paid for by the Owner as set out in Section 5, <br />Paragraph B. <br />Additional services due to significant changes in general scope of the project or <br />its design including, but not limited to, changes in size, complexity, or character <br />of construction when such changes are requested by the Owner. <br />Revising at Owner's request studies, reports, design documents, drawings or <br />specifications which were previously approved by the Owner except the Owner <br />shall not be obliged to pay when: <br />a) The initial project bids exceed the revised cost estimate (Section 2, C3) <br />and the changes aze required to bring the project cost within previously <br />Owner established limits, or <br />b) The changes aze required by regulating authorities or to bring the design <br />irno compliance with applicable codes or ordinances, or <br />c) The changes are required as a result of some enor or omission on the <br />part ofthe Consultant. <br />1 Furnishing of additional copies (beyond the basic contract sets) of reports and <br />additional prints of drawings, specifications, and contract documents. <br />4. Investigations involving detailed consideration of operation, maintenance, and <br />overhead expenses; and the preparation of rate schedules, earnings and expense <br />statements, feasibility studies, appraisals, and valuations; detailed quantity <br />surveys of material and labor; geotechnical testing; and material audits or <br />inventories required for certification of force account construction by the Owner. <br />Additional or extended services during the construction made necessary by (1) <br />work damaged by fire, vandalism, or other similaz causes not under the control <br />