Laserfiche WebLink
VJafer Treatment Plant Produdion Jiur.y <br />HISHAM (HUTCH) I. MUSALLAM, P.E. PROJECT MANAGER <br />Mr. Musallam is a project manager for the water and wastewater engineering group. <br />He specializes in water and wastewater h-eatrnent system design and evaluations, <br />biosolids dewatering and management and hydraulic evaluations of treatrnent <br />systems. Mr. Musallam is experienced in conducting and supervising bench scale <br />treatability studies and in houble-shooting and start-up assistance. He has managed <br />conceptual, preliminary and final design for conshuction projects totaling more than <br />$75 million. ~ <br />REPRFSENTATIVE WATER PROJECTS INCLUDE: <br />~ City of Beaumont, Texas - Project manager for the City of BeaumonYs <br />Water Treatment Plant 14 MGD Fxpansion. The initial phase of the project <br />includes the evaluations of the City's water treatrnent plant, current and <br />future needs with respect to growth and the Safe Drinking Water Act (SDWA) <br />requirements. The plant is being expanded to 40 MGD with provisions for <br />another 10 MGD in capacity in the near future. The project includes the <br />addition of a 50 MGD rapid mix facility, two 10 MGD solids contact clarifiers, <br />replacement of the existing filters with dual media filters with air scour <br />having, chemical feed modifications and the addition of chlorine dioxide as a <br />primary disinfectant. <br />~ City of Beaumont, Teacas - Project manager for the City's water treatment <br />plant five million gallon cleanuell and high service/filter backwash pump <br />station. The project included a two compartrnent, five million gallon baffled <br />cleanuelf, high service pump station, and miscellaneous chlorination and <br />chemical feed improvements. <br />♦ City of Beaumont, Texas - Project manager for the Lawson Canal and Raw <br />Water System Improvements. The project included a new 40 mgd raw water <br />pump station, 48-inch raw water main to replace the existing canal, and <br />preliminary treatrnent at the canal including screens and aeration. <br />1 RIJ.';L -NICHOL`; <br />