My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-I Water Production Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-I Water Production Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:54:38 AM
Creation date
4/29/2002 5:08:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-I
AGENDA - Type
RESOLUTION
Description
Award Water Prodecution Study - Freese and Nichols, Inc.
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VJoter Treatment Plant Procludion Stuciy <br />YEARS OF EXPERIENCE <br />With FNI <br />With Other Firms <br />EDUCATION <br />M5, Civil/Environmental Engineering, <br />University of Texas-Austin <br />BE, Civil Engineering, <br />The American Universiiy of Beirui <br />REGISTRATION <br />Texas P.E. No. 84750 <br />PROFESSIONAL TRAINING <br />Implementing the PaA 503 Biosolids <br />Regulations (16 Hovrs), Feb-95 <br />PROFESSIONAL EXPERIENCE <br />1994-Present Freese and Nichols <br />Project Manager <br />Project Engineer <br />1991-1993 University of Texas-Austin <br />Graduate Research Asst. <br />Graduate Teaching Asst. <br />1990 Consolidated Engineering <br />Environmental Engineer <br />~ City of Clebume, Texas - Project manager for the Ciiy's water treatrnent <br />plant sludge dewatering facilities. The project included water plant holding <br />tanks, sludge pump station and a centrifuge for water plant sludge <br />dewatering. <br />6 North and South Holly Water Treatrnent Plant, Fort Worth, Texas - Designed <br />the polymer feed facilities and prepared plans and specifications for the <br />backwash clarifiers and filter rehabilitation project including replacing the <br />filter underdrains and media. <br />& Easfland County Water Supply Dish-ict Water Treatment Plant - Evaluated <br />disinfection practices at the water treatrnent plant. <br />♦ City of Eastland, Texas - Evaluated and conducted lead and copper <br />corrosion control studies. <br />♦ Greenbelt Municipal and Indusirial Water Authoriiy - Conducted lead and <br />copper corrosion control evaluations. <br />6 City of Snyder, Texas - Designed and prepared specifications of a chemical <br />feed facility and other improvements for a 5 mgd expansion of the water <br />treatrnent plant. <br />~ City of Longview, Texas - Designed and prepared specifications for the <br />chemical feed facilities for Sabine & Cherokee Water Treatrnent Plant. The <br />design included lime feed facilities, alum, polymer, powdered activated <br />carbon and potassium pennanganate. Designed the improvements for the <br />rapid mix basin, flocculation basins and curtain baffle walls for the cleanueli. <br />♦ Brown County Water Improvement Disirict # 1- Project manager for a study <br />and on-site evaluation to upgrade the capacity of the water treatrnent plant <br />from 10 mgd to 12 mgd. <br />6 City of Clebume, Texas - Supervised operarion and start-up of a 2.0 mgd <br />phosphorus removal facility for industrial reuse. Work included modification <br />of design, start-up assistance, houble-shooting, chemical feed optimizaflon <br />and construction management. <br />
The URL can be used to link to this page
Your browser does not support the video tag.