My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-I Water Production Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-I Water Production Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:54:38 AM
Creation date
4/29/2002 5:08:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-I
AGENDA - Type
RESOLUTION
Description
Award Water Prodecution Study - Freese and Nichols, Inc.
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Treatment Plant Produdion Study <br />grit/sludge handling facilities, basins, clarifiers, blower buiiding, <br />office/warehouse building, numerous types and sizes of piping and <br />renovation/expansion of the existing laboratory, administration, maintenance <br />and electronics buildings. <br />~ <br />City of Brownwood, Texas - Construction manager for wastewater treatment <br />YEARS OF EXPERIENCE <br />W~th FNI ~ 2 <br />plant renovafions. The project involved expansion and renovation of the <br />With Other Firms <br />existing treatment plant to increase the capacity from 3.6 to 4.5 mgd and the <br />rehabilitation of the collection system by siiplining over 55,000 linear feet of <br />EDUCATION <br />existing clay tile sewer pipe, ranging in size from 6-inch to 30-inch. The <br />ME, Civil Engineering <br />improvements increased the capacity of the facilities from 3.6 to 4.5 mgd. <br />University of Texas-Arlington <br />BS, Civil Engineering <br />♦ <br />Colorado River Municipal Water District - Construction manager for seven <br />University of Texas-Arlington <br />new pump stations with power and telemehy systems for O.H. Ivie Pipeline <br />improvements. <br />REGISTRATION <br />Texas P.E. No. 55972 <br />~ <br />City of Stephenville, Texas - Conshvction manager for wastewater treatment <br />Certified Construction Controa <br />plant expansion improvements. The project involved expansion and <br />Administrator <br />renovation of the existing treatment plant to increase the capacity from 1.9 to <br />3.0 mgd. <br />PROFESSIONAL TRAINING <br />Construdion Documents Technologist, CDT <br />~ <br />City of Breckenridge, Texas - Conshuction manager for extensive <br />Nucleor Moisture/Density Gauge <br />improvements to the wastewater treatment plant. The project involved <br />Training, NMS, Feb-2000 <br />expansion and renovation of the existing treatment plant to increase the <br />capacity from 0.75 to 0.95 mgd. <br />PROFESSIONAL EXPERIENCE <br />6 <br />C <br />f M <br />1990 - Present: Freese and Nichols <br />ity o <br />ineral Wells, Texas - Constxuction manager for Willow Creek <br />Assouate <br />Wastewater Treatrnent Plant improvements. The project involved expansion <br />Constn,ction Services Discipline Leader <br />and renovation of the existing treatment plant to allow it to meet EPA <br />1990 - 1993: Resident Engineer <br />mandated discharge requirements. <br />1980 - 7 990: Dallas Water <br />Utilities <br />~ <br />Brown County Water Improvement District No. 1- Conshuction manager for <br />1979 - 1980: Other Firm <br />conshuction of 4,000 linear feet of new 30-inch treated water pipeline at the <br />water treatment plant. In addition, conshvction of a 1 million gallon ground <br />storage tank to replace the two exisfing tanks that are no longer serviceable <br />due to shuctural damage. <br />♦ <br />City of Clebume, Texas - Construction manager for wastewater treatment <br />f RLESF-NICNOlS <br />
The URL can be used to link to this page
Your browser does not support the video tag.