My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-I Water Production Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-I Water Production Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:54:38 AM
Creation date
4/29/2002 5:08:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-I
AGENDA - Type
RESOLUTION
Description
Award Water Prodecution Study - Freese and Nichols, Inc.
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V'Jater Treatmeni Planf Produdion Study <br />- <br />plant improvements. The project involved expansion and renovaflon of the <br />existing heatrnent plant to increase the capacity from 4.0 to 6.3 mgd. <br />~ City of Dallas, Texas - Construction manager at the Central Wastewater <br />Treatrnent Plant in charge of coordinating 10 simultaneously constructed <br />Capital Improvement Projects totaling in excess of $110 million. Project <br />duties included supervision of 22 Dallas Water Utilities inspection personnel <br />as well as negotiation and processing of all project change orders, claims and <br />documentation. <br />♦ City of Dal(as, Texas - Conshuction engineer for several projects involving <br />various plant facilities, including construction of a 150 mgd plant expansion <br />to the Eastside Water Purification Plant. <br />~ City of Dallas, Texas - Provided design assistance as an engineer-in-haining <br />for numerous water and sanitary sewer improvements for ffie Water UtiliHes <br />Departrnent. <br />~ Nagler Engineers - Provided design assistance as an engineer-in-training on a <br />$700,000 strip shopping center and a$5.5 million office building in Las <br />Colinas. <br />♦ Texas Parks and Wildlife Freshwater Fishery Center - Construction manager <br />for the construction of a new $7.0 million freshwater fishery center in Athens, <br />Texas. The project included conshuction of several large viewing lagoons, a <br />diving tank and reseazch facilities. <br />♦ Texas Christian University, Ed Landreth Hall, Fort Worth, Texas - <br />Construction manager for the mechanical and electricaf components of a <br />new $12 million perfonning facility on the TCU campus. <br />ib University of North Texas Environmental Science Building, Denton, Texas - <br />Conshuction manager for the mechanical and electrical components of a <br />new $15 million, three-story laboratory and classroom science facility on the <br />UNT campus. <br />~ University of North Texas Performing Arts Center, Denton, Texas - <br />Construction manager for the structural, mechanical and electricai <br />i ~ t , i ;cI ,I c. <br />I P<<sf <br />
The URL can be used to link to this page
Your browser does not support the video tag.