My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ Divisioa 2-A Sita Work <br />_ SITE W01tR 6 EXCP+VATION <br />GENERAI+c Furnish and install all labor, materials, tools, <br />and equipment to do all site work and excavation as shown <br />on plans, and herein specified. All labor and material <br />shall be guaranteed in accordance with the "General <br />Requirements". Comply with all conditions of the "General <br />Requirements". Cooperate with other trades in the <br />installation of their materials and the performance of <br />their work. This Contractor shall visit the site and <br />familiarize himself with the site conditions. <br />SCOPE: This Division shall include the removal of trees, <br />shrubs, and waste, moving of topsoil, site preparation, <br />cutting and filling, spreading and tamping, excavation, <br />including drilling of piers, ditching and grading, fine <br />grading, and'other such work as shown on plans and herein <br />specified. <br />pROTECTION OF PROP7RRTY: Take such precautions as necessary <br />s to protect the owner's property and neighboring property. <br />Protect all curbs, walks, and paving from damage, building <br />dirt "bridges" where required. Protect existing trees and <br />landscaping that has been designated to remain. Do not <br />cut, fill, or in any way disturb the soil under the "drip <br />line" of trees designated to remain, except with*permission <br />from the Architect. Protect the existing utilities from <br />damage. <br />gEMOVAL OS WA3TE: Remove from the site abandoned pipes and <br />waste material. Remove from the site trees and shrubs <br />designated to be removed. <br />FENCING: Before construction is commenced, the area <br />required for construction, access and storaqe, shall be <br />agreed on and the Contractor shall put up temporary fencing <br />to define the area that shall be restricted to construction <br />use. <br />ERISTiNG TOP SOIL: After foreign matters as described above <br />are removed froin the site, remove all topsoil approximately <br />6" deep, from all building areas, and paving areas and <br />areas to be cut to a lower grade or a higher grade. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.