My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 3-C Cast-In-Place Concrete <br />FINISHING: Except where otherwise shown, floor slabs, risers, <br />etc., shall be finished with a steel trowel and brought to a hard <br />slick finish. Special care must be taken to remove all <br />irregularities in floor slab. If necessary, floor shall be <br />rubbed with a carborundum stone, machine sanded, or as otherwise <br />directed to provide proper surface for floor finish. Porches <br />shall have light broom finish after steel trowel. CURBS AND <br />GUTTERS shall have float finish with all edqes tooled smooth. <br />SIDEWALKS shall have a wood float finish and have all edges <br />tooled. Provide deep tooled joint in walks 5'-0 o.c.. <br />DRIVES shall be finished as walks except tool joints shall be 15' <br />o.c.. <br />PROTECTION: Protect fresh concrete from rain and cold weather as <br />directed by the Architect. <br />CURING: As soon as concrete has reached initial set, it shall be <br />_ cured. Cure concrete floor by covering with Poly plastic (9 mi1 <br />thick min.) and keep completely covered for seven days. Provide <br />a 3" high dirt dam at edge of slab and flood slab with 1" of <br />water for seven days. <br />PATCHING AND FINISHING: Immediately after removing forms, all <br />concrete surfaces shall be inspected and any bad joints, <br />honeycomb, or other defects shall be patched before the concrete <br />is thoroughly dry. Any concrete work not properly formed, out of <br />alignment, or havitg a defective surface shall be brought to the <br />attention of the Architect be£ore any attempt is made to correct <br />the defect. When so directed, defective areas shall be chipped <br />away to a depth of not less than 1" with the edges, perpendicular <br />to the surfaces, and repaired as directed. The area to be <br />patched and the surface around the same shall be wet to avoid <br />absorption of water from patching mortar. The patch shall be <br />made with the same material and in the same proportions used in <br />the concrete, except that course aggregate shall be omitted and a. <br />small amount of white cement added. Cover with burlap and keep <br />wet for seven days. Exposed surfaces where necessary shall be <br />rubbed with a carborundum stone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.