My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR <br />F <br />Division 7-C <br />Metal Roofing <br />SHEETMETAL ROOFING AND ACCESSORIES <br />GENERAL: Do all work shown, specified, and required including <br />metal roofing, caulking, fasteners, insulation and trim <br />_ as related to roofing. Whife the products of a particular <br />manufacturer are specified, products of other manufacturers <br />may be substituted, provided the Contractor has first secured <br />the approval of the Architect. Before starting work the <br />Roofer shall submit to the Architect, a complete list of <br />the material he intends to use. <br />GUARANTEE: Upon completion of roof, the Roofer shall furnish <br />a letter to the Architect, guaranteeing the roof and flashing <br />against leaks for a period of two years. When so directed, <br />the Roofer shall during the period of guarantee, make repairs <br />without cost to the Owner. The Roofer will provide the <br />Owner with the manufacturer's 20 year guarantee on finishes <br />including a copy of the terms. <br />SCOPE: This section shall include all labor and material <br />for metal roofing as shown and described. <br />Including: ridge vents, metal flashing where shown or <br />required, gutters and down spouts, anchors, fastenings <br />and clips, gable ends, facias flashing, caulking and sealants <br />and removal of existing metal roof as reguired. <br />WORKING CONDITIONS: Contractor shall set up his equipment <br />and store materials in a safe place. He shall protect <br />walls, paving and so forth as required. The Contractor <br />may pull trucks into the yard adjacent to the building, <br />however; care shall be taken to prevent damage to lawns <br />and walks. Contractor shall set plastic "Warning" tape <br />around work area to protect Public from work area. <br />STORAGE OF MATERIALS: All,material stored on the job shall <br />be protected from ground moisture and shall at the end <br />of the day's work be completely covered with cover tied <br />and weighted in place. <br />CAULKING: Where shown on plans and as required, caulk <br />all flashing, closure strips, ridge cap, side and end closure <br />of panels and trim with gun grade polyurethane sealant. <br />Caulk shall be equal to Sonneborn's Sonolastic NP1. Color . <br />shall match surface it is applied to. Caulk at panel seams , <br />shall be ribbon Type S-M #5225, FED. SPEC. TT-C-1796A Type H- <br />Class B Spec #52-680. <br />ROOFING PANELS: Shall be equal to Ultra Seam standing <br />seam 2005 standing seam 18" wide, 24 gauge, 2" high, ASTM. <br />A446, Grade A(33.KS1 = Fy) panel with inter-locking seams <br />_ rolled and locked, and supported with concealed clips at <br />each seam at bearing. <br />Panel and clip shall have U.L. rating of Class 90 uplift. <br />Finish shall be 70% Kynar 500 fluorocarbon 1 mil. over <br />epoxy-base primer on finish side and wash coat on back side. 3^ <br />~r <br />
The URL can be used to link to this page
Your browser does not support the video tag.