My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 8-C <br />Fin. Hardware <br />FINISHING HARDWARE <br />GENERALLY: It is the intention of this specification to <br />cover a complete job of finishing hardware. If the Con- <br />-_tractor or Dealer discovers any errors or omissions, they <br />should be called to the attention of the Architect prior <br />to the opening of bids. Include all expansion shields, <br />bolts, screws, etc., of type, and finish required to pro- <br />perly attach hardware. Each item of finishing hardware <br />shall be properly wrapped and marked for the particular <br />opening or place in the building. <br />While catalogue numbers of a particular manufacturer is <br />listed herein-after, equal products of other manufactures <br />may be used when approved by Architect. The Contractor <br />is cautioned that regardless of catalogue numbers listed, <br />all locks shall have keepers and strikes of suuficient <br />length to avoid the latch bolt from coming in contact with <br />door casing. <br />Finishing hardware shall be installed and fitted prior <br />to painting and protected during painting. Hardware shall <br />be adjusted, and cleaned on completion. <br />SCHEDULES: Promptly after the award of Contract, the <br />Supplier shall submit to the Architect for approval three <br />(3) copies of hardware schedule. No hardware shall be <br />- delivered until schedule has been checked and approved. <br />This schedule shall contain all the finish hardware, door <br />schedule numbers, swing of doors, door material, door sizes, <br />frame material and all other information necessary for <br />proper application, <br />TEMPLATE HARDWARE: All hardware for metal doors and metal <br />jambs shall be made to template and secures with machine <br />screws. The supplier shall promptly after the Architect's <br />approval of schedule furnish templates to the metal door <br />and frame manufacturer showing the proper installation <br />of locks, butts, door closers, stops, holders, etc. Surface <br />mounted hardware will be properly reinforced by the metal <br />and frame manufacturer, but will be drilled and tapped <br />on the job by the erector. The supplier of finishing hard- <br />ware shall secure a copy of approved shop drawings where <br />template hardware is used and shall make sure that proper <br />provisions are being made for its application. <br />FINISA: Except where otherwise called for the finish of <br />all items shall be: Antique Bronze, oiled US10B. <br />KEYS AND KEYING: A11 locks shall be mastered keyed and <br />grand master keyed. All keying shall be as directed by <br />the Architect. Furnish two keys to each lock and three <br />of each masterkeys, and three grand master keys. All <br />cylinder locks shall be five pin tumbler. Except where <br />otherwise called for all locks shall be keyed differently. <br />Keys shall be properly tagged and delivered to the Owner <br />making sure that no keys are left in circulation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.