My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-F Groundwater Investigation
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
10 - October
>
2002-10-14
>
08-F Groundwater Investigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
10/11/2002 2:49:12 PM
Metadata
Fields
Template:
AGENDA
Item Number
8-F
AGENDA - Type
RESOLUTION
Description
Accepting a proposal from Weaver Boos & Gordon to for groundwater investigation - Stillhouse Rd Land
AGENDA - Date
10/14/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEAVER BOOS & GORDON, INC. <br />PuNNUAL FEE SCHEDULE <br /> January 200t <br /> <br />I. PROFESSIONAL STAFF U.S. $ <br /> a) t <br /> Principal/Corporate Consultant ................................................................................... Hr 140.00 <br /> b) Project Director/Office Director .................................................................................. Hr 120.00 <br /> c) Senior Project Manager ................................................................................................ Hr 110.00 <br /> d) Senior Project Engineer/Scientist ................................................................................. Hr 100.00 <br /> e) Project Manager ........................................................................................................... Hr 90.00 <br /> 0 Project EngineedScientist/Environmcntal Specialist .................................................... Hr 80.00 <br /> g) Staff EngineedScientist/Environmantal Specialist ....................................................... Hr 70.00 <br /> h) Engineer/Scientist/Environmental Specialist ................................................................Hr 60.00 <br /> <br />1]. TECHNICAL STAFF U.S.$ <br /> a) Construction Manager .................................................................................................. Hr 70.00 <br /> b) Construction Superintendent ........................................................................................ Hr 60.00 <br /> c) Survey Party Chief ....................................................................................................... Hr 70.00 <br /> d) System Specialist ......................................................................................................... Hr 60.00 <br /> e) Certified Technician ..................................................................................................... Hr 50.00 <br /> f) Senior Engineering Technician ............... : ..................................................................... Hr 48.00 <br /> · g) Engineering Technician ................................................................................................ Hr 40.00 <br /> <br />III. SUPPORT STAFF U.S. $ <br /> a) Senior CAD Designer ................................................................................................... Hr 65.00 <br /> b) CAD Designer .............................................................................................................. Hr 45.00 <br /> c) Technical Assistant ................................................................... ; ................................... Hr 35.00 <br /> d) Clerical/Word Processing ............................................................................................ Hr 40.00 <br /> <br />IV. GENERAL EXPENSES <br /> <br />a) Automobile Transportation ....................................................................................... Mi 0.45 <br />b) Subcontract Service or Rental ................................................................................... Cost + 15% <br />c) Report Preparation (outside services) ....................................................................... Cost 4- 15% <br />d) Outside Services <br /> (e.g. photographer, film processing, overnight delivery, etc.) ..................... Cost 4- 15% <br />e) Per Diem (food and Iodging)(Teclmical Staft~ ......................................................... $75/day <br />f) Per Diem (no Iodging)(Teclmical Staff) ...................................................................$25/day <br />g) Transportation by Commercial Carrier or Rental Car ............................................... Cost + 15% <br />h) Travel Expenses by Professional Staff. ..................................................... Cost + 15% <br /> <br />UNIT PRICE NOTES: <br />1. All professional, technical, and support staff time and expenses spent in furtherance of the client's work will be billed. T~is includes, <br /> but is not limited to, proposal, field, travel, research, technical review and reporling, project management, client meeting, and project- <br /> specific administrative time and expenses. <br />2. An overtime rate of 1.3 times the regtdar rate is billed for technical and suppor~ staff services for w~rk in ~xccss of 40 hours per week, <br /> work be~,veen 7:00 pm. to 5:00 a.m., and work on Saturdays. This overtime rate is increased to 2.0 times the regular rate for work on <br /> Sundays and holidays. <br />3. Included overhead includes the in-house costs of preparing three copies o f the written report, shippad via regular mail. Ex~'a report <br /> preparation work is billed separately. <br />4. Unless otherwise agreed to in writing, a monthly interest charge of 18% par annum, will be charged accruing from thc date of invoice, <br /> on all invoices not paid within 30 days. <br />5. The unit rates are subject to periodic modification (typically annually). These rate modifications will be incorporated into long-term <br /> projects, unless otherwise addressed in the project contract. <br />6. Deposition and testimony services are charged at 1.5 times the regular billing rote. <br /> <br />GENERAL EXPENSE NOTES: <br /> I. Rates quoted arc for expanses only, equipment purchased on the client's behalf is marked up 25% <br />2. Personnel rates are billed separately from gencral cxpanses. <br />3. S~andard non-disposable protective outer-wear or equipment damaged or contaminated by site conditions are billed at replacement <br /> cost plus 15%. <br />4 General expense mark-ups may be negotiated based upon contract size and payment terms. <br />5. The per diem rates set forth above are the standard rates we t~,pically use for our technical staff on projects. We reserve the right to <br /> modify these tales in high cost areas. <br /> <br />.4ny modification to thls fee schedule requires the written approval of tg~aver Boos & Gordon. Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.