Laserfiche WebLink
WEAVER BOOS & GORDON, INC. <br />ANNUAL-FEE SCHEDULE <br /> January 2001 <br /> <br />· . LABORATORY TESTING - SOILS .U.S. $ <br /> t A) Panicle-Size Analysis of Soils <br /> 1. Sieve Analysis (ASTM C 136) ........................................................... Ea 30.00 <br /> lA. Sieve Analysis-Washed (ASTM D 422) ............................................. Ea 50.00 <br /> 2. Hydrometer Analysis (ASTM D 422) ................................................ Ea 60.00 <br /> 3. % Passing #200 (ASTM D 1140) ....................................................... Ea 20.00 <br /> B) Atterberg Limi~ (Liquid & Plastic) (ASTM D 4318) ................................ Ea 50.00 <br /> C) Specific Gravity of Soils (ASTM D 854) ................................................... Ea 30.00 <br /> D) Moisture-Density Relation of Soil (Standard Proctor) (ASTM D 698) ...... Ea 125.00 <br /> E) Moistm'e-Density Relation of Soil (Modified Proctor) (ASTM D 1557) .... Ea 150.00 <br /> F) Falling Head Permeability Testing <br /> 1. Undisnubed Cohesive Soil ................................................................. Ea 125.00 <br /> 2. Cohesionless Soil (Constant Head) (ASTM 2434) ..................... ' ........ Ea 125.00 <br /> 3. Back Pressure Satm-ation (ASTM D 5084) ........................................ Ea 275.00 <br /> 4. One Remolded Proctor Point......: .......................................................Ea 75.00 <br /> · G) Bearing Ratio (CBR) of Laboratory C6mpacted Soils (1) Point Only .... . . .... <br /> (ASTM D 1883) ......................................................................................... Ea 150.00 <br /> H) Relative Density of Cohesionless Soils (ASTM D 4253, D 4254) ............. Ea 150.00 <br /> I) Unconfined Compressive Strength of Cohesive Soil, <br /> Failttre Stress at Maximum Strain (D 2166) ............................................... Ea 15.00 <br /> J) Consolidation Testing <br /> (Single Load-Unload Cycle (ASTM D2435) .......................................... i~.. Ea 275.00 <br /> K) Consolidation Additional Cycle .................................................................. Ea 50.00 <br /> L) Laboratory Determination of Mnisture Content of Soil (D 2216) ............... Ea 5.00 <br /> M) Moisture, Ash & Organic Content (LO.I) (ASTM D 2974) ....................... Ea 25.00 <br /> N) Visual Classification (ASTM D 2488) ........................................................ Ea 5.00 <br /> O) Extra Consulting Time <br /> 1. Laboratory Manager ........................................................................... Hr 45.00 <br /> 2. Laboratory Technician .......................................................................Hr 35.00 <br /> <br />VI. EQUIPMENT RENTAL FEES <br /> A) Well Sampling Costs (includes items B through G below) ......................... Day 100.00 <br /> B) pH, Specific Conductance and Temperature Meter .................................... Day 30.00 <br /> C) Groundwater Filter Pump ............................................................................ Day 20.00 <br /> D) Brainard Kilman Pump ............................................................................... Day 30.00 <br /> E) PVC Bailer .................................................................................................. Day 5.00 <br /> F) Teflon Bailer ............................................................................................... Day 10.00 <br /> G) Water Levellndicator ................................................................................. Day 25.00 <br /> H) Filter and Hose (for pump) ......................................................................... Ea 25.00 <br /> I) Modified Level "D" (Tyveks, Boots, Gloves)/per person/per chg of clothing Ea 30.00 <br /> J) Photoionization Detector Meter .................................................................. Day 100.00 <br /> K) Nuclear Density Gauge ............................................................................... Day 50.00 <br /> L) Surveying Equipment .................................................................................. Day 50.00 <br /> M) Laser Level ................................................................................................. Day 75.00 <br /> N) Air SampIing Equipment, per pump ........................................................... Day 25.00 <br /> O) Hand Operated Field Probe Equipment ...................................................... Day lO0.00 <br /> P) Explosimeter ............................................................................................... Day 25.00 <br /> Q) LandGem 500Gas Analyzer .......................................................................Day 75.00 <br /> <br /> TESTING AND RENTAL :NOTES: <br /> Rates for testing and equipment not listed abo', e are availabl,: on request. <br /> 2.Testing equipmem costs are negotiable for large quantities and for on-site laboratory programs. <br /> 3Laboratory unit prices cover cquspment and labor costs to pertbrrn standard test procedures and laboratory reports w~th normal turn- <br /> <br /> 5 Dady and ;,,eekly ra es co',er a max mum of 0 and 50 hours resp¢c <br /> 6. SAMPLES WILL NOT BE RETAINED beyond classification and tesling unless olher arrangememts are agreed to in <br /> <br />,4ny modification to this fee schedule requires the written appro~'al of Weaver Boos & Gordon, Inc. <br /> <br /> <br />