Laserfiche WebLink
October 10, 2002 <br /> <br />Mr. Shawn Napier <br />City Engineer <br />City of Paris <br />P.O. Box 9037 <br />Paris, Texas 75461-9037 <br /> <br />Re: ELEVATED WATER STORAGE FACILITY, BID NO. 82.48 <br /> <br />Dear Mr. Napier: <br /> <br />Bids for the new City of Paris Elevated Water Storage Facility were opened and publicly read <br />aloud on Tuesday, October 8, 2002, at 3:00 p.m. Two (2) bids were received and a tabulation of <br />the bids is attached. The bids were received provided for four (4) alternates providing for a 2.5 <br />million gallon tower, a 2.5 million gallon tower and a second structural floor for each of these <br />two tower sizes. Upon review of the contractor's qualifications and assessment of the bids, we <br />have concluded that the low bids submitted by Chicago Bridge & Iron Constructors, Inc. to be <br />acceptable. The contract time specified for this project is 400 calendar days. <br /> <br />It is our recommendation that the City of Paris City Council accepts the low bid for Alternate #2, <br />for the construction of the 2.5 Million Gallon Composite Tower, in the amount of $2,044,000.00 <br />and award the contract to Chicago Bridge & Iron Constructors, Inc. It is also our <br />recommendation that the City Council consider awarding Alternate #4 in the amount of <br />$46,000.00 for construction of a second structural floor <br /> <br />Please let us know if you require additional information or have any questions. <br /> <br />Sincerely, <br /> <br />BUCHER, WILLIS & RATLIFF CORPORATION <br /> <br />B. Frank Davis, Jr., P.E, R.P.L.S. <br />Project Manager <br /> <br />BFD:ma <br /> <br />Encl <br /> <br /> ENGINEERS ! PLANNERS I ARCHITECTS <br /> <br />601 SHliLLEY DRIVE, SUITE 202 II TYtER, TEXAS 75701-9439 I PHONE: 903'581 *7844 ! FAX: 903o581 o0178 <br /> <br /> <br />