My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G-4 Accept W/S Rate Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G-4 Accept W/S Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:03 AM
Creation date
4/11/2003 10:03:39 PM
Metadata
Fields
Template:
AGENDA
Item Number
03-G (4)
AGENDA - Type
RESOLUTION
Description
Accept findings of Reed,Stowe & Yanke
AGENDA - Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br /> Comprehensive Water Distribution System Audit <br /> <br /> Bridge and Lake Fork Pump Stations. Services provided on Fort Worth Northside II <br /> thisprojedincludedhydraulicanalysisanddesign, surge Water Transmission <br /> analysisanddesign, physicalinspections, computer network JVJain Design <br /> modeling, and analysis of C-value.protection and biofilm Fort Worth, Texas <br /> control. Carter & Burgess provided surveying and engineering <br /> services for 6.5 miles of 48- and 36-inch diameter water <br /> Puerto Flico North transmission main. ThewaterJineconveyswaterfromthe <br /> Coast Superaquaduct near north side of Fort <br /> Pipeline Worth, north to new <br /> San Juan, Puerto Rico developing areas. The <br /> Carter & Burgess participated in the design of 50-mites of water tine crosses <br /> 72-inch water transmission main to deliver treated water several creeks, existing~~~_'-.~ <br /> across the island of Puerto Rico. This project included an roads and utilities. The_ <br /> alignmentstudythrough developed areas and rural areas project also included <br /> along a major divided highway. Carter&Burgesswasalso designing a 24-inch <br /> responsible for preparation of plan and profile sheets and Venturi meter station, <br /> detail sheets, which included highway crossings and yard piping and meter <br /> construction along extremeJysteep terrain, vault to meter flow <br /> being pumped from the North Beach Street Pump Station <br /> $outhside Il Water ini'otheNorthsidellPressurePlane. Construction documents <br /> Transmission B/lain were prepared in phases in order to expedite construdion <br /> Fort Worth, Texas sincerights-of-wayforsomesectionsofthenewpipeline <br /> Carter & Burgess provided surveying and engineering were more readily available. The survey for the water line <br /> services for this project, which included a total of 6 miles of included setting control from USgS monuments, alignment <br /> pipeline of 35-inch and 48-inch water transmission main. and topographicsurveys, and preparation of right-of-way <br /> Survey tasks included setting controls, alignment and and easement documents. Allfield noteswere reduced and <br /> topographic surveys, and preparation of right-of-way and plotted using Intergraph software and hardware. Design of <br /> easementdocuments. The line conveyswaterfrom the near the pipeline included a del'ailed transient analysis, access <br /> north side of Fort Worth north to new developing areas, roads, alternative route studies to determine the most cost- <br /> The water line crosses several creeks, existing roads and e['fective route, detailed design, preparation of construction <br /> existing utilities. Design of the line included a hydraulic plans and specifications, advertising and bidding services, <br /> model and alternative route studies to determine the most and construction management services. <br /> cost-effective route, detailed design, preparation of <br /> constructionplansandspeciflcations, adverfisingandbidding East Canyon <br /> servicesandconstructionmanagementservices. Theprojed B/licrofiltration Water <br />,,~: involved construction sequencing and phasing to Treatment Plant <br />' accommodatetheimprovementofa2-JanecountyroadtoSummit County, Utah <br />:]~: a 4-lane divided thoroughlare. Carter & Burgess is providing consulting services as District <br /> '"" Engineer to develop and implement master plans. Providing <br /> ongoing engineering services to find and develop water <br /> sources, such as wells, springs and surface waters (in an <br /> <br /> Carter Burgess <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.