My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G-4 Accept W/S Rate Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G-4 Accept W/S Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:03 AM
Creation date
4/11/2003 10:03:39 PM
Metadata
Fields
Template:
AGENDA
Item Number
03-G (4)
AGENDA - Type
RESOLUTION
Description
Accept findings of Reed,Stowe & Yanke
AGENDA - Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Propose/ <br /> Comprehensive Water Distribution System Audit <br /> <br /> Themostermetermeosurestheflowofwaterthroughthestudies and site <br /> J ;)-inch pipelines. The project will include about 700 feet selection for the water <br /> of line along Texas SH J J4 and about 2,300 feet of water treatment plant and <br /> line inside the development. The master, meter uses a SCADA the raw water intake/ <br /> System, which transmits signals from the master meter to pump station; <br /> the city of Fort Worth to inform water department employees alternate route studies <br /> oftheamountofwaterflowingthroughthewaterlines. The for conveyance <br /> SCADA system transmits to the central facility information facilities; selection of <br /> concerning chlorine residual, temperature, pressure and J]ow. final alignment for the <br /> row water pipeline; <br /> Lake Fork Pipeline right-of-woysurveys;preparationofcostestimatesforsystem <br /> Dallas, Texas construction, operation and maintenance; and preparation <br /> Carter & Burgess is designing 26 miles of 108-inch raw ora milestone schedule ~or implemenfingthe development <br /> water transmission line ~or Dallas Water Utilities. The line of Lake Palestine as a water supply source for the City of <br /> hasahydrauliccapacityof2i6MGDandwillrunfromtheDallas. Carter&Burgessisalsopartofateampreparing <br /> Lake Fork Pump Station on the western shore of Lake Fork final geometric alignment and easement documents for <br /> to the vicinity of the Iron Bridge Pump Station on the west right-of-way acquisition o2 over ] 80 parcels over the 85- <br /> shore of Lake Tawakoni. The scope of services includes mile proiectlength. <br /> hydraulic design, alignment selection, right-of-way <br /> document preparation and acquisition services, surge Lake tawakoni <br /> analysis and on-site construction representation. Pipelines <br /> Dallas, Texas <br /> In addition to upgrading the Iron Bridge Pump Station, <br /> Carter& Burgess wasresponsible forperforming condition <br /> assessments for the existing J 5 miles of parallel 72- and <br /> 84-inch water transmission mains from Lake Tawakoni to <br /> i~!~ =z.., ~ ~ the Tawakoni Balancing Reservoir. The staff performed <br /> <br /> evaluation of various alternatives for long-term cleaning of <br /> the pipelines. The pipeline cleaning options included <br />Lake Palestine Water continuous chemical disinfection with liquid chlorine and <br />Utilization and Pipeline hypochlorite, periodic shock chlorination, and mechanical <br />Alignment Project ("pigging") cleaning methods. The importance of the <br />Dallas, Texas pipelinecleoningcannotbeoversteted, sincearapidincrease <br />Carter & Burgess performed detailed utilization and Jn pipeline roughness occursifchlorJnotJon is terminated. <br />· alignment studies to develop preliminary plans for a ] 20- The increase in friction, which results in lower C-values, <br />~ MGD raw water intake and pump station at Lake Palestine, dramatically increases power costs for pumping. <br /> more than 85 miles of 84-inch raw water pipeline and <br /> associated appurtenances from Lake Palestine to Dallas, TheprojectaJsoinciudedextensivehydraulJcanalysisofthe <br /> and the 300-MGD Southeast Dallas Water Treatment Plant, existing pipelines, penCorming surge analysis on the lines, <br /> the pipel/ne's terminus. The assignment involved revising the design ofthesurge protection equipment, and <br /> preparation of preliminary hydraulic designs; alternate route computer modeling of the lines in coniunction with the Iron <br /> <br /> Carter Burgess <br /> 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.