My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G-4 Accept W/S Rate Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G-4 Accept W/S Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:03 AM
Creation date
4/11/2003 10:03:39 PM
Metadata
Fields
Template:
AGENDA
Item Number
03-G (4)
AGENDA - Type
RESOLUTION
Description
Accept findings of Reed,Stowe & Yanke
AGENDA - Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br /> <br />updating of its andltar¥ fees and charges. This includes <br />establishing financial and service policies for the merged <br />utility. An evoluetion of each city's distribution system is <br />also being performed with the resLflts being incorporated <br />into the initial pricing structure for the merged utility <br />operation. The goal is development of a unified rate structure <br />equalized over a seven to ten year period. <br /> <br />Dallas Water Utilities <br />Retail Water Rate <br />Study <br />Dallas, Texas <br />Cad'er & Burgess is preparing a rate study for retail water <br />service. This includes revenue requirements and allocation <br />of cost to all customer classes. In addition, this project <br />includes a depreciation analysis of infrastructure assets to <br />review the useful lives of all of the department's assets for <br />water and sewer. Carter & Burgess is also developing cost <br />of service and design of water supply standby charges. <br /> <br />City of Longview Meter <br />Accuracy Tests <br />Longview, Texas <br />Severn Trent Pipeline Services conducted a study of six meters. <br />Velocih/profiles were taken and measured at each location. <br />The flow was measured at three di~erent flow rates to <br />determine performance flow of each meter. Twenty-four <br />hour flow measurements were also made at each location. <br /> <br />City of Corpus Christi <br />Meter Accuracy Tests <br />Corpus Christi, Texas <br />Severn Trent Pipeline Services conducted a study of four <br />meters. Velocity profiles were taken and measured at each <br />location. The flow was measured atthree different flow <br />rates to determine performance flow ofeach meter. Twenly- <br />four hour flow measurements were also made at each <br />location. <br /> <br />Carter Burgess <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.