ALBERT PETRASEK, Jr, PhD, PE <br />Page 3 <br /> <br />· Iron Bridge Raw Water Pump Station Renovations, Dallas, Texas; Project Dimdor for the renovation of the 240 MGD raw water <br /> pump station. Project included the mechanical, electrical, instrumentation and controls, and structural components. Estimated <br /> construction cost of S21 million. <br /> <br />· Lake Fork Raw Water Transmission Line, Dallas, Texas; Project Director for the design and construction administration of 26 <br /> miles of 108-inch raw water transmission main. Line will run from the Lake Fork Pump Station, on the western shore of Lake <br /> Fork, to lhe Iron Bridge Pump Station on the western shore of Lake Tawakoni. Estimated construdion cosl is $111 million. <br /> The first sedion, which is 3%000 LF, is under construction for a contrad amount of S27 million. <br /> <br />· Lake Fork Pump Station, Dallas, Texas; Prepared design and cost estimates for the 216 MGD pump station with a connected <br /> load of 24,000 HP. Prepared computer simulations of 26 miles of 'JOB-inch line, 15 miles of 72-inch line, and 15 miles of <br /> 84-inch line with 14 pumping units in lwo different pump stations. Estimated construdion cost of S27 million. <br /> <br />· Shorecrest 48-Inch Water Main, Dallas Water Utilities; Principal-In-charge for the design of 4,000 LF of 48-inch water main <br /> located on the north end of Love field in Dallas, Tx. The main conneded into the yard piping at the Bachman Water Treatment <br /> Plant. The construction cost was S920,000. <br /> <br />· Lake Tawakoni Transmission Lines; Dallas, Texas; Project Director for the condition assessment, surge analysis, and surge <br /> protection upgrading to 15 miles of 72-inch and 15 miles of 84-inch raw water transmission main. <br /> <br />· Iron Bridge Raw Water Pump Station No. 2, Dallas, Texas; Projed Diredor for the preliminary design of the 300 MGD raw <br /> water pump slation. Services provided included surveying, preparation of preliminary plans, cost estimates, and compuler <br /> simulation of system hydraulics. Estimated construction cost is S25 million. <br /> <br />· Water Treatmeot Plant, Oily of Donna, Texas; Principal-In-Charge for the design of o new 6 MGD surface water treatment plant. <br /> Facilih/included raw water intake strudures, reactor-cJarifiers, filters, clearweJJ storage, and high service pumping. Disinfedion <br /> for CT is with chlorine dioxide followed by chlorination. Estimated constmdion costs of S5,300,000. <br /> <br />· Long Range Water Supply Plan for Dallas Water Utilities; Principal-In-Charge. This projed developed an implementation <br /> program for the eastern portion of the Cily of Dallas system under drought conditions. The project had total estimated capital <br /> costs of SSO0,O00,O00 and included a new 100 MGD surface water treatment plant, improvements to an existing ] 76 MGD <br /> pump station, the construction of a new 100 MGD pump station, and the construction of over 100 miles of 72 and 84-inch <br /> transmission lines. <br /> <br /> · Benbrook Water Treatment Plant Expansion, Texas; Projed Manager; project included the expansion from 5.0 MGD to 11.0 <br /> MGD. The treatment facilities included new rapid mixing basins, fJocculatJon basins, clarifiers, and filters; additionally, <br /> improvements were designed to lhe lransfer pump station, high service pumps, and instrumentation and control system. <br /> Construction cost of S2,500,000. <br /> <br /> <br />