My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G-4 Accept W/S Rate Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G-4 Accept W/S Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:03 AM
Creation date
4/11/2003 10:03:39 PM
Metadata
Fields
Template:
AGENDA
Item Number
03-G (4)
AGENDA - Type
RESOLUTION
Description
Accept findings of Reed,Stowe & Yanke
AGENDA - Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />II ALBERT PETRASEK, Jr, PhO, PE <br /> Page 4 <br />I <br /> <br /> · Water Transmission Uno, Dallas, Texas; Projed Engineer; Project included the design of 11 miles of 96-inch RCCP water <br /> transmission line from the East Side Water Treatment Plant to Jim Miller Reservoir. Construdion cost of S24,000,000. <br /> <br /> · Water Transmission Line, Dallas, Texas; Project Engineer; Projed for Dallas Water Utilities included the design and construdion <br /> management of 17 miles of 84-inch transmission line from Jim Miller Pump Station to the Bel~ood Reservoir. Construdion <br /> cost was S27,000,000. <br /> <br /> · ClSCO- Water Plant, Confidential Client, Australia, Project Manager; preparation of cost estimates and preliminary design of <br /> a reverse osmosis water treatment facility for a BOD contractor. Project included the evaluation of existing well field as a <br /> source of supply, and design of modifications 1o existing facilities to accommodate the new treatment processes. <br /> <br /> · Design of Water Meter Slations for Dallas Water Utilities. Project includes the designs for three metering stations; Hackberry, <br /> Elm Fork, and Jameson; that provide water metering service for DWU customer cities. Estimated projed cost S4,500,000. <br /> <br /> · Water Supply for the City of Mansfield. Design of well, ground storage, and booster pumps for the city. <br /> <br /> · Safe Drinking Water Act Studies, Lone Star Army Ammunition Plant and Red River Army Ammunition Depot Texarkana, Texas; <br /> Proied Manager; Safe Drinking Water Act studies for the 3.0-MGD surface water treatment plant, including CT study and <br /> compliance evaluation. <br /> <br /> · Water Storage and Pumping Facilities, Highland Park Texas; Project Manager; design of 1,500,O00-gallon Gillon Avenue <br /> ground storage reservoir and booster pump station, including chlorine storage, handling, feeding and leak detedion <br /> equipment. Construdion cost S1,500,000. <br /> <br /> · Red Oak Water Treatment Plant, Red Oak, Texas; Projed Manager; sanitary survey and preliminary design for Red Oak <br /> Reservoir and preliminary design of 30-MGD treatment plant. Estimated construdion costs of S45,000,000. <br /> <br /> · Ozone/UV Disinfedion Studies; Project Engineer; performed evaluation of combined ozone/UV disinfection as an alternative to <br /> chlorination. The process was found to he significantly improved over the use of either process individually. <br /> <br /> · Ozonation Studies; Project Engineer; performed evaluation of ozone contador design. <br /> <br /> · Projed was performed for the U. S. EPA and included counter-current bubble diffusers, packed columns, and continuous-flow <br /> stirred tank readors. <br /> <br /> · D/FW Airport Booster Pumps, D/EW International Airport, Texas; Projed Manager; addition of IO-MGD booster pumps at <br /> D/FW's East and West Pump Stations. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.