Laserfiche WebLink
· <br />II ALBERT PETRASEK, Jr, PhO, PE <br /> Page 5 <br /> <br />II · Comprehensive Developmental Master Plan for the Cily of Orange, Texas; Project Manager/Engineer. Pro·ed included the <br />I development of a Comprehensive Developmental Plan roi this city of 23,000 in southeast Texas. Work performed included the <br /> preparation of land use plans; master plans for water, waslewater, and municipal so·id wastes; mapping of the city; and <br />I development of the city GIS. <br />· <br /> · Water and Wastewater Master Plans for the City of Wiimer, l'exas; Pro·ed Manage(Engineer. Project included the preparation <br />· of both water and wastewater master plans for this city of 5,000. Planning period was through the year 2020. <br /> <br /> · Utility Master Planning, Lone Star Army Ammunition Plant, Texarkana, Texas; Principal-in-Charge; preparation of Facility Plan <br />J for this industrial comp·ex of over 40 square miles in north east Texas. Work included water distribution system, wastewoter <br />j colledion system, the water treatment plant, the wastewater treatment plant, and perJorming a leak detection study on the <br /> distribution system.. <br />! <br /> <br /> · Bexar County Water System Planning, San Antonio, Texas; Project Manager; development of Emergency Water Plan. Projed <br /> included developing the protolype emergency water plan for lhe Corps of Engineers for San Antonio, Texas, which has 101 <br /> water pun/eyors, all using the Edwards Aquifer as the source of supply. <br /> <br />! <br />! <br />! <br /> <br />· <br />· <br />· <br />! <br />! <br /> <br />· <br />· <br />· <br /> <br />! <br /> <br /> <br />