My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G-4 Accept W/S Rate Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G-4 Accept W/S Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:03 AM
Creation date
4/11/2003 10:03:39 PM
Metadata
Fields
Template:
AGENDA
Item Number
03-G (4)
AGENDA - Type
RESOLUTION
Description
Accept findings of Reed,Stowe & Yanke
AGENDA - Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· <br />· <br />· <br /> liON HAYES, PE <br />· Civil Engineer <br />· Carter E Burgess, Inc. <br /> <br /> Education <br /> B.S., Civil Engineering, 1980 <br />· Old Dominion University <br /> <br /> Professional Registration <br /> Registered Professional Engineer <br /> 1985, TX, 58807 <br /> <br /> Organizations <br /> American Society of Civil Engineers <br /> Texas Natural Resource Conservation Commission <br />! <br /> Professional Experience <br /> Mr. Hayes has over 20 years of experience in civil engineering consulting with responsibility for planning and management of civil <br /> · and environmental engineering projeds. Mr. Hayes has extensive experience in the preparation of plans, specifications and <br /> estimates for water, wastewater, drainage and paving projects. <br />! <br /> Relevant Project Experience <br /> <br />:J · Iron Bridge Pump Station Preliminary Design, TX; Project Engineer. Design of 22-mile, 108-inch diameter raw waler <br /> transmission pipeline from Lake Fork to Lake Tawakoni. <br />! <br /> <br />J · Lake Fork Pipeline, Dallas, TX; Projed Engineer. Project consisted of designing 26-miles of 108-inch diameter raw water <br /> transmission pipeline from Lake Fork to Lake Tawakoni in east Texas. The design included preliminary hydraulic design of a <br />J future Lake Fork Pump Station, surge analysis for the transmission system, final plans and specifications for the pipeline, <br />! permiffing by the Corps of Engineers and TXDOT, conducting environmental and archeological surveys. Estimated construction <br /> cost of S90,000,000. <br /> <br />! · North Park Public UliJiiy District, Harris County, TX; Projed Engineer. Provided services to distrid including design and <br /> preparation of technical specifications and contract documents for water, wastewater, paving and drainage improvements. <br />il Services included construdion oversight, progress payment review, state agency submittals and fund applications. <br /> <br /> · Water and Wastewater Design for Unserved Areas, Dallas, TX; Proied Engineer. Preliminary design and evaluation for 770 <br />J unserved areas in Dallas. Design oversight for 19,200 linear feet of 8-inch wastewater main and 8,400 linear feet of 16-inch <br />jj water main under first unserved area construction contract. <br />I1 <br /> <br />! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.