My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-040 Adopting a Parks Master Plan for the City of Paris
City-of-Paris
>
City Clerk
>
Ordinances
>
2011-2020
>
2013
>
2013-040 Adopting a Parks Master Plan for the City of Paris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 1:32:22 PM
Creation date
12/5/2013 1:20:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
12/2/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br />In 2013, the City of Paris commissioned MHS Planning and Design, LLC to assist in developing <br />a new Parks, Recreation and Open Space Master Plan. This plan is a follow -up to Paris's 2001 <br />Parks and Recreation Master Update which has guided additions to and renovations of the park <br />system over the last 12 years. <br />The 2013 -2023 Parks, Recreation and Open Space Master Plan is intended to: <br />• Provide the City of Paris with an information base to help guide decisions related to <br />parks, recreation and open space <br />• Assist in the implementation of those decisions and set guidelines for future park and <br />open space development <br />• Provide feasible recommendations to the governmental body and be in accordance with <br />the desires of Paris' residents <br />• Include all land within the City of Paris <br />• Provide parks and open space project recommendations through 2023 <br />• Provide emphasis and detailed cost projections for projects recommended for <br />implementation <br />The following pages of the Master Plan contain: <br />• Goals and objectives for a comprehensive city wide parks and open <br />space network <br />• The methodology used in developing the plan <br />• An inventory of existing facilities which make up the park network <br />• An analysis of local needs, the adopted parks, recreation and open <br />space priorities <br />• The implementation program developed to guide the city in <br />accomplishing the proposed projects within the plan's time frame <br />• Potential funding sources that may assist with the implementation <br />of the proposed projects <br />�1 <br />P.W- WIS <br />,TE %ASS <br />City of Paris Parks, Recreation & Open Space Master Plan 2013 -2023 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.