My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br /> violation of any such law, ordinance or regulation by himself or by his <br /> employees. <br /> <br /> 2.1.1 The Contractor shall cooperate with applicable City, State, or <br /> Federal officials and inspectors at all times where their <br /> jurisdiction prevails. If such officials or inspector deems any <br /> inspection necessary, the Contractor shall provide assistance and <br /> facilities that will expedite his inspection. The Contractor shall <br /> make application and pay all costs for any permits and all temporary <br /> services and utilities which are required for the execution of the <br /> Contract. Costs of all permits, inspection fees, service, utility <br /> fees, taps, etc., shall be included as part of the total cost of the <br /> work. <br /> <br />2.2 WAGE RATE__S: The Contractor is required to pay not less than the wage scale <br /> of the various classes of labor as shown on the "Prevailing Wage Schedule" <br /> provided by the Owner. The specified wage rates are minimum rates only, and <br /> the Owner will not consider any claims for additional compensation made by <br /> any Contractor because of payment by the Contractor of any Wage Rates in <br /> excess of the applicable rate contained in the Contract. <br /> <br /> 2.2.1 Pursuant to the provisions of Section 2258.023(b) of chapter 2258, <br /> Government Code <br /> <br /> "A contractor who violates this section shall pay to the state or a <br /> political subdivision of the state on whose behalf the contract is <br /> made, $60 for each worker employed for each calendar day or part of the <br /> day that the worker is paid less than the wage rates stipulated in the <br /> contract. A public body awarding a contract shall specify this penalty <br /> in the contract." <br /> <br />2.3 STATE SALES TAX: The Owner may qualify for exemption from State and Local <br /> Sales Tax pursuant to the provisions of the Texas Limited Sales, Excise and <br /> Use Tax Act (Taxation - General, Article 20.04, V.T.C.S.). The Contractor <br /> may confirm exemption from payment of applicable State Sales Taxes at the <br /> pre-bid conference with the engineer, and if exempt, may claim exemption by <br /> complying with such procedures as may be prescribed by the State Comptroller <br /> of Public Accounts. <br /> <br /> ARTICLE III. CONTRACT DOCUMENTS AND BONDS <br /> <br /> 3.1 COPIES FURNISHED - DRAWINGS AArD SPECIFICATIONS: The Contractor will be <br /> furnished free of charge the number of complete sets of the Contract <br /> Drawings and Specifications as provided in the Supplemental Conditions. <br /> <br /> 4/11/03 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.