My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br />-- Project. In event of a change in Superintendents, the Owner's <br /> Representative must be notified in writing. <br /> <br /> 5.14 ShoD Drawinqs and SamDles: <br /> <br /> 5.14.6 The Engineer/Project Manager, or the Owner, will review and approve <br /> the Shop Drawings and Samples with reasonable promptness, but only <br /> for conformance with the design concept of the Project and with the <br /> information given in the Contract Documents. <br /> <br /> ARTICLE VI. CONTRACT CHANGES <br /> <br /> 6.3 Claims for Additional Costs: <br /> 6.3.3 No Contractor claim for additional costs shall be assertable after <br /> the making and accepting of final payment. <br /> <br /> ARTICLE VII. CONTRACT PAYMENTS <br /> <br /> 7.2 Pro ress Pa ents: <br /> 7.2.6 Requests for payment shall be made to Owner through the <br /> <br /> Engineer/Project Manager at his mailing address. <br /> ARTICLE VIII. CONTRACT COMPLETION TIME <br /> <br /> 8.1 Work Order: <br /> 8.1.1 After the Contract has been executed by both parties, the Owner and <br /> the Contractor shall attend a preconstruction conference with the <br /> Engineer/Project Manager, at which time a date for the Contract time <br /> to begin will be mutually agreed upon and the Notice To Proceed <br /> issued accordingly. Arrangements will be made for this conference <br /> within the next work day that both parties are available of the date <br /> of the Contract execution. <br /> 8.2 Work proqress Schedule. Etc.: Within the next work day that both parties <br /> are available after the date of purchase order, the Contractor shall submit <br /> to the Owner an estimated progress schedule, properly executed Performance <br /> and Payment Bonds, Certificates of Insurance and any other information <br /> required by the Contract Documents. The estimated progress schedule shall <br /> indicate the dates for the starting and co~pletion of the various <br /> classifications of construction. <br /> 8.3 Com letion of Work: The Contractor will be held to account for the work <br /> being completed in the number of calendar days as specified by the bid form <br /> and scope of work upon which the Contract is based. <br /> <br /> 8.5 Failure To ComDlete Work on Time: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.