My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br /> runnin9 water controllable at the tap and suitably arranged for <br /> complete showering during decontamination. <br /> <br /> 1.1.113 Staging area - Either the holding area or some area near the waste <br /> transfer airlock where containerized asbestos waste has been placed <br /> prior to removal from the work area. <br /> <br /> 1.1.114 Start date - The dates defined as: <br /> <br /> (A) asbestos abatement activity start date - The date on which the <br /> removal of asbestos begins or any other asbestos abatement <br /> activity begins, such as site preparation which would break up, <br /> dislodge, or similarly disturb asbestos. <br /> <br /> (B) demolition/renovation start date The date on which the <br /> demolition or renovation process begins. <br /> <br /> Stop date - The dates defined as: <br /> <br /> (A) asbestos abatement activity stop date (completion date) - the <br /> date upon which visual and/or air monitoring clearance of <br /> asbestos abatement activities has been completed or containment <br /> materials have been removed. <br /> <br /> (B) demolition/renovation stop date The date on which the <br /> <br /> demolition or renovation is complete. <br /> <br /> 1.1.115 Strip - To take off friable asbestos materials from any part of <br /> facility. <br /> <br /> 1.1.116 Structural member - Any load-supporting member of a facility, such <br /> as beams and load-supporting walls or any non-load-supporting <br /> member, such as ceilings and non-load-supporting walls. <br /> <br /> 1.1.117 Surfacing Material - material that is sprayed-on, troweled-on or <br /> otherwise applied to surfaces, such as acoustical plaster on <br /> ceilings and fireproofing materials on structural members, or other <br /> materials on surfaces for acoustical, fireproofing, or other <br /> purposes. <br /> <br /> 1.1.118 Surfactant - A chemical wetting agent added to water to improve <br /> penetration. <br /> <br /> 1.1.119 TEM - Transmission Electron Microscopy. <br /> <br /> 1.1.120 Thermal System Insulation (TSI) - Material applied to pipes, <br /> fittings, boilers, breeching, tanks, ducts, or other interior <br /> structural components to prevent heat loss or gain, or water <br /> condensation, or for other purposes. <br /> <br />-. 4/lx/o3 35 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.