My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br /> and analyzed, final copy of waste manifest with all <br /> signatures. <br /> <br /> 1.4.1.3.1.2 Optional additional records consisting of shower <br /> log, safety equipment issued, regulatory inspection <br /> reports, Grade D air records for Type C systems, <br /> security service logs and any other records the <br /> <br /> contractor wishes to submit documenting the <br /> project. <br /> <br /> 1.4.2 Owner shall through his representative <br /> <br /> 1.4.2.1 Prior to Commencement of Work: <br /> <br /> 1.4.2.1.1 Notify occupants of work areas that may be disrupted by <br /> the abatement of project dates and requirements for <br /> relocation. Arrangements must be made prior to start, for <br /> relocation of desks, files, equipment and personal <br /> possessions to avoid unauthorized access into the work <br /> area. (Note: Notification of all building occupants and <br /> users is recommended in order to prevent unnecessary or <br /> unauthorized access to the contaminated work area). <br /> <br /> 1.4.2.1.2 Submit to the Contractor, results of pre-abatement air <br /> sampling including location of samples, names of the Air <br /> Sampling Professional, equipment utilized and method of <br /> analysis. <br /> <br /> 1.4.2.1.3 Document that Owner's employees or representative who will <br /> be required to enter the work area during abatement have <br /> received training equal to that detailed in Part 4, <br /> Section 4.1. <br /> <br /> 1.4.2.1.4 Provide to the Contractor information concerning access, <br /> shutdown and protection requirements of specialized <br /> equipment and systems in the work area. <br /> <br /> 1.4.2.2 During Abatement <br /> <br /> 1.4.2.2.1 Submit to the Contractor, results of bulk material <br /> analysis and air sampling data collected during the course <br /> of the abatement. These sample results are for <br /> information only. They serve only to monitor Contractor <br /> performance during the project and shall not release the <br /> Contractor from any responsibility to sample to document <br /> OSHA compliance. <br /> <br />1.5 Site Sscurity <br /> <br /> 1.5.1 The work area is to be restricted only to authorized, trained, and <br /> protected personnel. These may include the Contractor's employees, <br /> employees of Subcontractors, Owner employees and representatives, <br /> <br />4/11/03 49 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.