My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-F Water/Sewer (5/15/03)
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
06 - June
>
2003-06-09
>
03-F Water/Sewer (5/15/03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:36 AM
Creation date
6/9/2003 3:25:48 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Water & Sewer Subcommittee <br />May 15, 2003 <br />Page 14 <br /> <br />BE TAKEN, IF ANY. ALARM CALLS REQUIRE THE DISPATCHING OF <br />LIFT STATION PERSONNEL. WHEN ANY CONDITION CHANGES AT <br />THE LIFT STATION, THE OPERATOR MUST AGAIN CONTACT LIFT <br />STATION PERSONNEL AND HAVE THEM CONFIRM THIS SITUATION. <br />THE WATER PLANT OPERATOR MUST CONTACT THE POWER <br />PROVIDER AND ARRANGE FOR REPAIRS. FREQUENTLY, LOSS OF <br />POWER AFFECTING THE LIFT STATIONS CREATES A POWER <br />OUTAGE OVER A LARGE AREA OF THE POWER GRID AND RESULTS <br />IN A LOSS OF POWER AT GROUND STORAGE, PAT MAYSE PUMP <br />STATION, AND/OR THE TREATMENT PLANT. THE OPERATORS MUST <br />CONTEND WITH THESE PROBLEMS IN ADDITION TO DISPATCHING <br />FOR THE LIFT STATIONS. THE OPERATORS MUST IMPLEMENT A <br />DETAILED WRITTEN PROCEDURE FOR HANDLING POWER OUTAGE <br />ANY TIME THOSE OCCUR AND THIS ALSO INVOLVES DEPLOYING <br />EMERGENCY LIGHTS, STARTING THE GENERATOR, RECORDING <br />STORAGE LEVELS, AND SHUT DOWN OF SOME EQUIPMENT AND <br />OTHER DUTIES SPECIFIC TO AREAS AFFECTED BY AN OUTAGE. IF <br />IT WASN'T FOR THE RESPONSE TIME THAT IS ACHIEVED FOR <br />HAVING TWO PERSONNEL ON SHIFT, THE CITY OF PARIS WOULD <br />MOST PROBABLY STILL BE UNDER CERTAIN ADMINISTRATIVE <br />ORDERS FROM THE STATE FOR WASTEWATER OVERFLOWS AND <br />BYPASSES. <br /> <br />THERE WERE MORE THAN 2,600 ALARM CALLS LAST YEAR. FOR <br />EVERY ALARM CONDITION THERE MUST BE A RETURN-TO- <br />NORMAL CALL AND LIFT STATION PERSONNEL AGAIN MUST BE <br />CONTACTED. SOME ALARMS ARE FOR LOW PRESSURE AT THOSE <br />LIFT STATIONS WITH PRESSURE MONITORS AND OFTEN PUBLIC <br />WORKS MUST BE CONTACTED TO CHECK FOR A WATER LEAK IN <br />THE DISTRIBUTION SYSTEM IN THE AREA OF THE ALARM. THERE <br />ARE POLL CALLS 3 TIMES A DAY OF ALL EIGHTEEN RACE UNITS TO <br />VERIFY WORKING CONDITIONS, OR 1,095 PER YEAR. THERE ARE <br />ALSO 4 AUTO CALLS PER DAY TO ALSO VERIFY THE WORKING <br />CONDITION OF UNITS, OR 1460 CALLS PER YEAR. OPERATORS ARE <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.