My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-B-(2) Water/Sewer
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
06 - June
>
2003-06-16
>
03-B-(2) Water/Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:08 AM
Creation date
6/13/2003 9:01:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
3-B-(2)
AGENDA - Type
REPORT
Description
Issues discussed at prior metings of Water & Sewer Subcommittee
AGENDA - Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PARIS <br /> UTILITIES DEPARTMENT <br /> WATER TREATMENT PLANT <br /> <br /> TWO PERSONNEL ON SHIFT AFTER HOURS AND WEEKENDS <br /> <br /> THE TREATMENT PLANT MUST BE MANNED ANYTIME WATER IS BEING <br />TREATED BY A "C" CERTIFIED OPERATOR OR GREATER. AT PRESENT, THE PARIS <br />PLANT MUST BE IN OPERATION 24 HOURS A DAY, 365 DAYS A YEAR, IN ORDER TO <br />MEET DEMAND OR INSURE ADEQUATE STORAGE. IT TAKES ONE YEAR OF <br />HANDS-ON EXPERIENCE AND ADDITIONAL TRAINING AND PASSING A STATE <br />TEST TO BECOME A "C" CERTIFIED OPERATOR. THE LAW ALSO SAYS THE PARIS <br />PLANT MUST ALSO EMPLOY AT LEAST ONE "B" CERTIFIED OPERATOR. IN THE <br />PAST EIGHTEEN YEARS THE CITY OF PARIS HAS NOT BEEN ABLE TO ATTRACT OR <br />RECRUIT ANY "B" CERTIFIED OR HIGHER CERTIFIED OPERATORS TO THE WATER <br />TREATMENT PLANT. ALL HAVE BEEN TRAINED HERE ON SITE. <br /> IN ORDER TO INSURE THAT ALL WATER QUALITY STATE MANDATES ARE <br /> MAINTAINED, OPERATORS COLLECT OVER 167,000 SAMPLES FOR ANALYSIS AND <br /> RUN MORE THAN 250,000 ANALYSES PER YEAR. EVERY HOUR OPERATORS <br /> COLLECT A SERIES OF SAMPLES FROM VARIOUS PARTS OF THE PLANT AND <br /> SOME SAMPLES MUST BE COLLECTED OFF-SITE DAILY. WE HAVE NOT HAD ANY <br /> PUBLIC NOTIFICATION OF NON-COMPLIANCE OR FINES TO THIS DATE. FOR <br /> EXAMPLE ON SATURADAY, DECEMBER 7' 2002, A 20" WATER MAIN RUPTURED. <br /> HAD THERE NOT BEEN TWO CERTII~IED WATER PLANT OPERATORS ON SHIleT <br /> DURING THAT TIME, THE CITY OF PARIS WATER TREATMENT PLANT WOULD <br /> HAVE BEEN FORCED TO ANNOUNCE A PUBLIC NOTIFICATION TO BOIL WATER <br /> DUE TO LOW DISTRIBUTION PRESSURE. <br /> <br /> WATER PLANT PERSONNEL ALSO RECEIVE ALL CALLS FROM THE RACO <br /> SCADA SYSTEM WHICH SERVE PRIMARILY WASTEWATER LllVT STATIONS. THE <br /> OPERATOR MUST READ THE CALL, WHICH IS 20 LINES OF INFORMATION, AND <br /> INTERPRET WHAT ACTION MUST BE TAKEN, IF ANY. ALARM CALLS REQUIRE <br /> THE DISPATCHING OF LIFT STATION PERSONNEL. WHEN ANY CONDITION <br /> CHANGES AT THE LIFT STATION, THE OPERATOR MUST AGAIN CONTACT LIFT <br /> STATION PERSONNEL. MANY OF THESE ARE FOR LOST POWER. AFTER LIFT <br /> STATION PERSONNEL HAVE CONFIRMED THIS SITUTATION, THE WATER PLANT <br /> OPERATOR MUST CONTACT THE POWER PROVIDER AND ARRANGE FOR REPAIRS. <br /> FREQUENTLY, A LOSS OF POWER AFFECTING THE LIFT STATIONS CREATES A <br /> POWER OUTAGE OVER A LARGE AREA OF THE POWER GRID AND RESULTS IN A <br /> LOSS OF POWER AT GROUND STORAGE, PAT MAYSE PUMP STATION, AND/OR THE <br /> TREATMENT PLANT. THE OPERATORS MUST CONTEND WITH THESE PROBLEMS <br /> IN ADDITION TO DISPATCHING FOR THE LIFT STATIONS. THE OPERATORS MUST <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.