My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-A Work by Day Policy
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
12 - December
>
2003-12-08
>
06-A Work by Day Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:20:08 AM
Creation date
12/5/2003 8:29:34 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A
AGENDA - Type
RESOLUTION
Description
Policy for Performance for Work by the Day
AGENDA - Date
12/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Engineer determines the premium rate is applicable. Such authorization <br />must be stated on the invoice which the contractor presents for payment to the <br />City on a daily basis. The City will pay no premium rate unless authorized in <br />advance by the City Engineer. <br /> <br />As part of the qualification process, each contractor seeking qualification to <br />perform service for the City must sign an indemnification agreement agreeing <br />to in all things indemnify the City for any liability which may arise as a result <br />of the negligence or other actions of the contractor, including the contractor's <br />subcontractors, agents, employees, or other individuals responsible to the <br />contractor. In addition, the contractor will be required to provide proof of <br />workers compensation insurance and general liability insurance applicable to <br />work performed by the contractor on the project. The City shall be <br />designated as an additional insured under the general liability coverage. The <br />minimum limits for such liability insurance shall be $250,000.00 per individual, <br />$500,000.00 per claim, and $100,000.00 for any property damage. Each <br />proof of insurance must obligate the insurance carrier to provide thirty (30) <br />days written notice to the City in advance of termination of any such <br />coverage. If at any time the insurance coverage required hereunder is <br />terminated or allowed to lapse, the contractor shall automatically be <br />disqualified from further work for the City until such time as appropriate <br />insurance coverage is in effect. <br /> <br />To be a contractor qualified to perform day work (other than emergency work <br />or work requiring specialized expertise or equipment not available locally) for <br />the City of Paris, said contractor must maintain its primary business location <br />in Lamar County, Texas. <br /> <br />All information required under this section related to the qualifications of <br />contractors shall be updated on an annual basis; provided, however, should <br />any change occur in a contractor's status with regard to the information <br />provided hereunder, the contractor shall be obligated to provide immediate <br />notice to the City of such change. <br /> <br />Section 4. Procedural Requirements. <br /> <br />The procedural requirements set out herein shall apply to all non-emergency <br />work by the day projects. To the extent these procedures can be applied in <br />the instance of an emergency, they shall likewise apply. <br /> <br />The City Engineer shall determine in his judgment whether a pending City <br />project is appropriate for work by the day. In making such a judgment, the <br />City Engineer shall consider the nature and scope of the work, the anticipated <br />cost of the project, the scheduled need for completion of the project, and <br />other factors. <br /> <br />-5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.