Laserfiche WebLink
Russell Gibson, P.E. <br />System Assessment/Su p port <br />Years Experience: 21 <br />Registration: Professional Engineer, Texas 1987 (#61883) <br />Education: B.S., Civil Engineering, Texas A& M University, 1981 <br />Mr. Gibson has designed and managed a variety of water transmission projects as a <br />member of Freese and Nichols' Pipeline and Pump Station Deparfment. <br />Assignments he has been responsible for include design and resident representation <br />of water distribution and wastewater collection system improvements, water storage <br />facilities, and major water transmission systems. <br />Project Experience: <br />Domestic Water System Improvements - Texas A&M University - Project <br />manager for design improvements. The project included adding a 3 million gallon <br />ground storage tank, pipeline extensions, various cross-connections and valve <br />improvements, joint bonding and cathodic protection to pipelines and various <br />instrumentation and electrical improvements. <br />Bryan East Side Access Road Project - City of Bryan, Texas - Design engineer <br />for wastewater utilities on the Bryan East Side Access Road Project with 12-inch and <br />smaller wastewater collection mains. <br />Onion Creek and Boggy Creek Wastewater Interceptor - City of Austin, <br />Texas - Project engineer on the Onion Creek and Boggy Creek Wastewater <br />Interceptor, with 13,000 linear feet of 36-inch and 54-inch wastewater lines at a <br />construction cost of $4.2 million. <br />Southwest Borger Sewage Collection System - City of Borger, Texas - Project <br />and construction engineer for the Southwest Borger Sewage Collection System <br />covering gravity sewer, force main and lift station design. <br />Braker Lane Street Project - City of Austin, Texas - Design engineer for <br />wastewater utilities on the Braker Lane Street Project east of Loop 1(MOPAC) <br />including 10-inch wastewater collection mains. <br />Nolan Creek Tributary II Wastewater Interceptor - City of Killeen, Texas - <br />Project manager for the Nolan Creek Tributary II Wastewater Interceptor with <br />20,000 feet of 6-inch to 36-inch wastewater lines. <br />Willow Springs Wastewater Interceptor Preliminary Phase I- City of Killeen, <br />Texas - Project manager for the Willow Springs Wastewater Interceptor Preliminary <br />Phase I, including 24,000 feet of 30-inch and 36-inch wastewater interceptor. <br />South Killeen Wastewater Master Plan Study - City of Killeen, Texas - Project <br />manager for the South Killeen Wastewater Master Plan Study. <br />Downtown Borger Sewer Replacement Project - City of Borger, Texas - Project <br />design and construction engineer for the Downtown Borger Sewer Replacement <br />project. <br />Wastewater Interceptors Project - City of Keene, Texas - Project manager for the <br />Wastewater Interceptors Project, including 30,000 feet of 10-inch to 18-inch <br />wastewater interceptors. <br />Innova[ive approaches . . <br />EMOONI <br />FrNSa sm Nicholf <br />prac[ical results <br />Water System Vulnerability Asse±srnent and Emergency Re:pome Plan <br />