Laserfiche WebLink
Wade Zemlock <br />Electrical Engineering Intern <br />Years Experience: 5 <br />Education: B.S., Electrical Engineering, Texas Tech University, 1998 <br />Mr. Zemlock is experienced in electrical system design including SCADA systems, <br />medium voltage distribution systems for wastewater treatment facilities, water <br />treatment facilities, raw water pump stations, and wastewater lift stations. <br />Project Experience: <br />Water System Vulnerability Assessments - Brown County WID # 1 and the <br />Cities of Abilene, Beaumont, Carrollton, Denton, Corpus Christi, Garland, Irving, <br />Midlothian, Plano, Norfh Richland Hills, San Angelo and Temple, Texas. Reviewed <br />Water Utility Vulnerability Assessments related to power instrumentation and SCADA. <br />Provided not only recommendations for physical improvements, but also operational <br />and procedure changes. <br />Transfer Pump Station Electrical System Upgrade - City of Fort Worth <br />(Electrical Designer) - Update electrical system for an existing water treatment plant <br />in downtown Fort Worth. Design included routing power and control to three <br />2400V, 3 Phase 200hp motor; one 2400V, 3 Phase 250hp motor; reconnecting to <br />existing feeders; and providing power to a new pad-mounted oil-filled 750KVA, <br />2400V, 3hp transformer that serves a new 480V Motor Control Center (MCC). The <br />480V MCC serves one 150hp motor, one 125hp motor, one 75hp motor, one <br />30hp motor and an existing MCC vertical section that were to be re-used. The <br />project included wire and conduit sizing for medium voltage cables and switch and <br />fuse sizing for medium voltage. The 2400V MCC implements a main tie main <br />configuration on the incoming feeders. <br />Boiler Replacement, Electrical System Renovation - Tarrant County College <br />(Electrical Designer) - Renovate electrical system for an existing mechanical room for <br />Tarrant County College in Fort Worth. The project included removing existing boilers <br />and pumps, and placing new boilers, pumps and water heaters in the mechanical <br />room. The project also included determining what wire and conduit could be re- <br />used and what disconnects could be re-used. The scope of the project also included <br />checking circuit breakers to determine whether or not it had enough ampacity to <br />handle the new equipment. <br />Electrical System Design for New Bank - Bank Of America, Irving, Texas - <br />Design electrical system for a new bank in Irving. The project included load analysis, <br />lighting and power distribution, panel sizing, wire and conduit sizing, clearance of <br />electrical equipment, energy calculation, connect HVAC equipment, fire alarm <br />system, pneumatic controls and security system. <br />Electrical System Design for Building Renovation - Service King <br />Headquarters, Richardson, Texas - Design electrical system for a single story office <br />building renovation in Richardson. The project included lighting and power <br />distribution, panel sizing, wire and conduit sizing, clearance of electrical equipment, <br />Innovative approaches <br />connect HVAC equipment, fire alarm system, provide enough spare ampacity for <br />future expansion, and parking lot lighting. <br />rmoil <br />Fn*sa +m Nlchob <br />prac[ical results <br />Wa[er System Vulnerability A~cescment and Emergency Respome Plan <br />