Laserfiche WebLink
MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Shawn Napier, P.E. <br />City Engineer <br /> <br />DATE: March 10, 2004 <br /> <br />SUBJECT: Description of Change Order No. 3 on the 24" Transmission Line, No. 82.49 <br /> <br /> The water line was placed in a section of Maple Street from 17th St. N.W. to just West of <br />19th St. N.W. This section of street has been overlaid several times in the past and was in fair <br />condition prior to starting the project. The residents along this portion of Maple Street are <br />supplied with a two-inch water line. This line has been repaired numerous times in the past. The <br />line has been leaking in places for an indefinite period of time causing the roadway subgrade to <br />lose strength. Since the new water lines have been placed in Maple St. the structural stability of <br />the roadway has been greatly diminished. In order to return the subgrade to a condition that will <br />support an asphalt overlay, the top six inches of the subgrade will be cement stabilized if this <br />change order is approved. <br /> <br />CCi <br /> <br />Larry W. Schenk, City Attorney <br />Terry Townsend, Director of Public Works <br /> <br /> <br />