My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-B 24" Water Line - CO3
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
03 - March
>
2004-03-15
>
02-B 24" Water Line - CO3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:56 AM
Creation date
3/12/2004 6:36:11 PM
Metadata
Fields
Template:
AGENDA
Item Number
2-B
AGENDA - Type
RESOLUTION
Description
24" Water Line Project - Change Order No. 3 to Buster Contract
AGENDA - Date
3/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> <br />F:XAttorneyXALICEXRESWORK\CURRENTX24 Inch Waterline Change Order No 3 Res.wpd <br /> March 12, 2004 <br /> <br />RESOLUTION NO. <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, <br />PARIS, TEXAS, APPROVING AND AUTHORIZING CHANGE ORDER NO. <br />3 TO CONTRACT FOR THE 24" RCCP WATER TRANSMISSION LINE; <br />MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE <br />SUBJECT; AND DECLARING AN EFFECTIVE DATE. <br /> <br /> WHEREAS, the City Council of the City of Paris did heretofore, on the 13th day of <br />January, 2003, in Resolution No. 2003-021, award the contract for the "24" RCCP Water <br />Transmission Line Project" to Buster Paving, a Division of APAC-Texas, Inc.; and, <br /> <br /> WHEREAS, the City Engineer, Shawn Napier, acting as project engineer, recommends <br />the amendment of the contract for said project to return the subgrade of a section of Maple Street <br />from 17th Street N.W. to just west of 19th Street N.W. to a condition that will support an asphalt <br />overlay to cement stabilize the top six inches of the subgrade, which is covered by the allowance <br />for construction contingency, and providing for no increase in the contract price; and, <br /> <br /> WHEREAS, the form of Change Order No. 3, attached hereto as Exhibit A, should, in <br />all things, be approved, and the Mayor should be authorized to execute the same; NOW, <br />THEREFORE, <br /> <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, <br />TEXAS: <br /> <br /> Section 1. That the findings set out in the preamble to this resolution are hereby in all <br />things approved. <br /> <br /> Section 2. That the form of Change Order No. 3 to Contract for the "24" RCCP Water <br />Transmission Line Project," attached hereto as Exhibit A, to return the subgrade of a section of <br />Maple Street from 17th Street N.W. to just west of 19th Street N.W. to a condition that will <br />support an asphalt overlay to cement stabilize the top six inches of the subgrade, which is <br />covered by the allowance for construction contingency, and providing for no increase in the <br />contract price, be, and the same is hereby, approved. <br /> <br /> Section 3. That the Mayor be, and he is hereby, authorized and directed to execute, on <br />behalf of the City of Paris, said Change Order No. 3, upon the terms and conditions and in the <br />form shown in Exhibit A, attached hereto. <br /> <br />Section 4. That this resolution shall be effective from and after its date of passage. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.