Laserfiche WebLink
c:� J .3 <br />CHANGE <br />Distribution to: <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />ORDER <br />OWNER <br />FLI <br />—0- <br />ARCHITECT <br />D <br />AIA DOCUMENT G701 <br />CONTRACTOR <br />bythis change Order .......................... ............................... $ <br />6 , 275 <br />FIELD <br />11 <br />The Contract Time will e (increased) (decreased) (unchanged) by <br />OTHER <br />11 <br />PROJECT: Paris Public Library <br />(name, address) 326 S. Main ` <br />Parts, TX 75460 <br />TO (Contractor): <br />rAudley Moore Construction Company 1 <br />P.O. Box 595 <br />Sulphur Springs, TX 75482 <br />CHANGE ORDER NUMBER: <br />INITIATION DATE: - 3/24/87 <br />ARCHITECT'S PROJECT NO: 17.64 <br />CONTRACT FOR: <br />CONTRACT DATE: <br />You are directed to make the following changes in this Contract: <br />Lump sum <br />8/11/86 <br />Add overhead door, masonry pilasters, rework grade beam as per revised drawings 1 -5. <br />Nut valid until signed by both the 0%%ner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ <br />702,100., <br />Net change by previously authorized Change Orders ................................... $ <br />—0- <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ <br />702,100 ., . <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />bythis change Order .......................... ............................... $ <br />6 , 275 <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />708, 375 . <br />The Contract Time will e (increased) (decreased) (unchanged) by <br />( 4 ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is July 18, 1987 <br />r Authorized: <br />Wt11.4 1. �.td� <br />,,. 1 a AIA Audley Moore Construction Company <br />ARCHITECT Ud i OTOR OWNER <br />Address Address Address <br />Sulphur Springs, TX 75482 <br />xt" -� <br />v BY <br />r <br />DATE RATE March 24., 1987 DATE <br />AIA DOCUMENT 6701 • CHANGE ORDER APRIL 1978 EDITION AIAS 0 1978 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.w., WASHIN(.TON, D.C. 20W) <br />6701 —1978 <br />