Laserfiche WebLink
C <br />r-- <br />EXHIBIT B <br />1987 CENTRAL INTERCEPTOR REHABILITATION <br />PHASE I <br />COST ESTIMATE <br />MATERIALS <br />27" Polyethylene Pipe <br />48" Dia. Polyethelene M.H. <br />Bedding Materials <br />Concrete Encasement <br />Road Bore or Crossing Casement <br />48" Dia. Concrete M.H. <br />LABOR <br />Trenching, Bedding, Backfill <br />Build (4) Poly M.H. <br />Place Concrete Encasement <br />Build (2) Concrete M.H. <br />Mobilization Dewatering <br />871000ST.EST <br />2,400 <br />L.F. <br />UNIT <br />TOTAL <br />EST.QUAN. <br />PRICE <br />PRICE <br />2,400 <br />L.F. <br />23.50 <br />56,400 <br />58 <br />L.F. <br />115.00 <br />6,670 <br />800 <br />C.Y. <br />16.00 <br />12,800 <br />120 <br />C.Y. <br />45.00 <br />5,400 <br />55 <br />L.F. <br />30.00 <br />1,650 <br />28 <br />L.F. <br />50.00 <br />1,400 <br />TOTAL <br />MATERIALS <br />84,320 <br />2,400 <br />L.F. <br />22.00 <br />52,800 <br />8 <br />Hr. <br />85.00 <br />680 <br />8 <br />Hr. <br />85.00 <br />680 <br />8 <br />Hr. <br />85.00 <br />680 <br />2,000 <br />TOTAL <br />LABOR <br />56,840 <br />TOTAL PROJECT $141,160 <br />179 <br />