Laserfiche WebLink
i# <br />b � 'Y '_.; <br />RESOLUTION NO. 2192 <br />WHEREAS, the City Council of the City of Paris, did <br />at its special meeting on the 8th day of July, 1982, approve <br />the advertisement for bids for furnishing all plant, labor, <br />material and equipment and performing all work required for <br />the construction of 65 linear feet of curb and gutter; 177 <br />square yards of asphalt pavement; 185 square feet of 6" <br />thick concrete driveway; 895 square feet of 4" thick reinforced <br />concrete driveway; one 8 ft x 3.5 ft x 57 ft reinforced concrete <br />boxed culvert; and one 8 ft x 3.5 ft x 70 ft reinforced concrete <br />boxed culvert along Buttermilk Creek, Paris, Texas, entitled <br />Buttermilk Creek Drainage Project, Phase I, which bids were <br />received until 10:00 o'clock A.M., Monday, July 26, 1982; and, <br />WHEREAS, the best bid for such construction project was <br />made by B & B Equipment Company, P 0 Box 517, Paris, Texas 75460, <br />and it should be awarded the contract for such construction; and, <br />WHEREAS, the form of contract for such construction project <br />is attached hereto as Exhibit A, and such form should be approved; <br />NOW, THEREFORE, <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, <br />that the bid of B & B Equipment Company, for the Buttermilk <br />Creek Drainage Project, Phase I, in the amount of $40,109.00 <br />is hereby accepted and let, conditioned upon said contractor <br />meeting all of the terms and specifications included in the <br />bid documents; and, <br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, <br />Joe Graham, be, and he is hereby authorized and directed to execute, <br />on behalf of the City of Paris, the contract for the Buttermilk <br />Creek Drainage Project, Phase I, upon the terms and conditions <br />and in the form shown in Exhibit A attached hereto with B & B <br />Equipment Company. <br />Passed and adopted this 27th day of July, 1982. <br />ATTEST: <br />H. C, Greene, City C er <br />APPROVED AS TO FOR11: <br />K. Hayrfts, City Attorney <br />00--, el�j� - <br />e Graham, Mayor <br />Resolution No. 2193 authorizing and directing the Mayor to execute a <br />contract with B & B Equipment for the Buttermilk Creek Drainage Project <br />Phase II in the amount of $26,605.00 was presented. A motion was made <br />by Councilman Wilson, seconded by Councilman McWaters for adoption of <br />the Resolution. The motion carried 5 ayes, 0 nays. <br />