My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:33:28 AM
Creation date
2/18/2015 3:25:38 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v , <br />CITY OF PARIS Exhibit "A" <br />� -J <br />CONTRACT CHANGE ORDER <br />.oject: Main Outfall Sewer Construction Phase I <br />,r,tractor: Dual Construction Change Order Number: „nn,. <br />antract <br />:em No. <br />Description of Change <br />Increase in <br />Contract <br />Decrease in <br />Contract <br />6 <br />'Concrete Manholes - eliminate 3 <br />$4800.00 <br />6 <br />Concrete Manholes - Revise design of 3 <br />remaining manholes <br />$2850.00 <br />IVA <br />Creek Crossing - Pull 120 feet of 24" <br />Polyethylene through existing 27" pipe, <br />plus all related work. City will clean <br />the line. <br />$6360.00 <br />NOTE • The ta--2h <br />unforseen dificulties whic ude the <br />complete insertio ae liner and <br />agree t ensate the Contractor at <br />F <br />Totals <br />9210.00 <br />$4800.00 <br />Total Amount of Change by this Order $ 4410.0 <br />Total P -mount of Previous Chance Orders $ -0- <br />Original Contract Lmount $ 69,426.00 <br />New Contract Amount $ 93,836.00 <br />This Change Order will Increase the length of the Contract by 28 calanucr days. <br />increase /decrease <br />Iecommended by: <br />...ccepted by: <br />- ..pproved by: <br />October 27, 1982 <br />City Engineer Date <br />Contractor Date <br />City Representative in Authority <br />Date <br />City Manager Greene requested approval of a change order to the contract with <br />B & B Equipment Company for the Buttermilk Creek Project which would permit <br />payment on a per item basis instead of the lump sum upon project completion <br />presently in the contract. <br />Mr. Greene recommended the Contractor be paid for work he had finished at the <br />Collegiate Drive structure and completed retainer walls. <br />Following discussion, Councilman McWaters made a motion to allow payment on a <br />per completed item basis as recommended by Mr. Greene, Councilman Wilson seconded <br />the motion which carried 7 ayes, 0 nays. <br />Resolution No. 2214 authorizing a corrected Warrant Deed on the sale of City <br />property to Producer's Livestock Exchange, I c., was presented. After City <br />Attorney Haynes explained the need for the corrected deed a motion was made by <br />Councilman Wilson, and seconded by Councilman Williams for adoption of the Resolution. <br />The motion carried 7 ayes, 0 nays. <br />
The URL can be used to link to this page
Your browser does not support the video tag.